X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686101302000

Well Details

Well ID: 0686101302000
Loading map...
Location: 00/02-13-068-10W6/0
Location Alias: 00/02-13-68-10 W6M
Location Alias 2: 00/02-13-068-10 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 10
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: LONG RUN ELM 2-13-68-10
Operator Name: Long Run Exploration Ltd.
License Number: 0442125
License Date: 2011-12-29
License Status: Issued
Spud Date: 2012-01-19
Final Drill Date: 2012-01-28
Well Total Depth: 2186.00 m
Surface Hole Latitude: 54.891760
Surface Hole Longitude: -119.390672

For data sources see[1][2]

Well History

Date Event
2011-12-29 Obtained License
2012-01-20 Surface Casing Operation Performed
2012-01-21 Direction Drilling Operation Performed - Deviate
2012-01-23 Direction Drilling Operation Performed - Horizontal
2012-01-28 Finished Drilling
2012-01-28 Well Mode changed to Drilled and Cased
2012-01-30 Production Casing Operation Performed
2012-01-30 Rig Released
2012-02-01 Well Log Performed
2012-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-08 Well Began Production
2012-02-08 Well Fluid changed to Gas
2012-02-08 Well Mode changed to Flowing
2013-07-09 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-19 Champion Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-21 800.00 Deviate (5 - 79 degrees)
2012-01-23 1129.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-05 Multi-Stage Fracture 2117.00 2117.10 0
2012-02-05 Multi-Stage Fracture 2016.70 2016.80 0
2012-02-05 Multi-Stage Fracture 1910.50 1910.60 0
2012-02-05 Multi-Stage Fracture 1804.80 1804.90 0
2012-02-06 Multi-Stage Fracture 1698.70 1698.80 0
2012-02-06 Multi-Stage Fracture 1592.80 1592.90 0
2012-02-06 Multi-Stage Fracture 1487.30 1487.40 0
2012-02-06 Multi-Stage Fracture 1369.20 1369.30 0
2012-02-06 Multi-Stage Fracture 1263.90 1264.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6768 0.0 0.0 0.0
2013 7679 0.0 0.0 0.0
2014 8234 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 5831 0.0 0.0 0.0
2018 5523 0.0 0.0 0.0
2019 8090 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-07-10 No Incident Encountered 0.00 0.00
2013-07-26 No Incident Encountered 0.00 0.00

For data sources see[8]

References