If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0686083212020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.951664,"lon":-119.217045,"icon":""}]} |
Location: 02/12-32-068-08W6/0 | |
Location Alias: 02/12-32-68-08 W6M | |
Location Alias 2: 02/12-32-068-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 6 | |
Range: 08 | |
Section: 32 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: SINOPEC B ELM 12-32-68-8 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0494398 | |
License Date: 2019-05-07 | |
License Status: Issued | |
Spud Date: 2019-05-17 | |
Final Drill Date: 2019-06-05 | |
Well Total Depth: 5520.00 m | |
Surface Hole Latitude: 54.951664 | |
Surface Hole Longitude: -119.217045 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-05-17 | Ensign Drilling Inc. | T449 | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2019-05-20 | 700.80 | Deviate (5 - 79 degrees) |
2019-05-29 | 2998.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-06-08 | Open Hole/Barefoot Completion | 5512.80 | 5520.00 | 0 |
2019-07-27 | Multi-Stage Fracture | 5045.50 | 5045.60 | 0 |
2019-07-27 | Multi-Stage Fracture | 4997.50 | 4997.60 | 0 |
2019-07-27 | Multi-Stage Fracture | 4949.60 | 4949.70 | 0 |
2019-07-27 | Multi-Stage Fracture | 4901.90 | 4902.00 | 0 |
2019-07-27 | Multi-Stage Fracture | 4854.90 | 4855.00 | 0 |
2019-07-27 | Multi-Stage Fracture | 4807.50 | 4807.60 | 0 |
2019-07-27 | Multi-Stage Fracture | 4760.40 | 4760.50 | 0 |
2019-07-27 | Multi-Stage Fracture | 4713.30 | 4713.40 | 0 |
2019-07-28 | Multi-Stage Fracture | 4666.10 | 4666.20 | 0 |
2019-07-28 | Multi-Stage Fracture | 4616.00 | 4616.10 | 0 |
2019-07-26 | Multi-Stage Fracture | 5490.50 | 5490.60 | 0 |
2019-07-28 | Multi-Stage Fracture | 4564.20 | 4564.30 | 0 |
2019-07-28 | Multi-Stage Fracture | 4511.60 | 4511.70 | 0 |
2019-07-28 | Multi-Stage Fracture | 4460.30 | 4460.40 | 0 |
2019-07-28 | Multi-Stage Fracture | 4407.80 | 4407.90 | 0 |
2019-07-28 | Multi-Stage Fracture | 4356.70 | 4356.80 | 0 |
2019-07-28 | Multi-Stage Fracture | 4305.30 | 4305.40 | 0 |
2019-07-28 | Multi-Stage Fracture | 4253.50 | 4253.60 | 0 |
2019-07-28 | Multi-Stage Fracture | 4201.30 | 4201.40 | 0 |
2019-07-28 | Multi-Stage Fracture | 4149.70 | 4149.80 | 0 |
2019-07-28 | Multi-Stage Fracture | 4097.20 | 4097.30 | 0 |
2019-07-26 | Multi-Stage Fracture | 5425.90 | 5426.00 | 0 |
2019-07-28 | Multi-Stage Fracture | 4049.20 | 4049.30 | 0 |
2019-07-28 | Multi-Stage Fracture | 4001.30 | 4001.40 | 0 |
2019-07-28 | Multi-Stage Fracture | 3953.30 | 3953.40 | 0 |
2019-07-28 | Multi-Stage Fracture | 3905.30 | 3905.40 | 0 |
2019-07-28 | Multi-Stage Fracture | 3857.50 | 3857.60 | 0 |
2019-07-28 | Multi-Stage Fracture | 3809.50 | 3809.60 | 0 |
2019-07-28 | Multi-Stage Fracture | 3761.60 | 3761.70 | 0 |
2019-07-29 | Multi-Stage Fracture | 3713.60 | 3713.70 | 0 |
2019-07-29 | Multi-Stage Fracture | 3666.00 | 3666.10 | 0 |
2019-07-29 | Multi-Stage Fracture | 3618.00 | 3618.10 | 0 |
2019-07-26 | Multi-Stage Fracture | 5366.60 | 5366.70 | 0 |
2019-07-29 | Multi-Stage Fracture | 3570.10 | 3570.20 | 0 |
2019-07-29 | Multi-Stage Fracture | 3522.40 | 3522.50 | 0 |
2019-07-29 | Multi-Stage Fracture | 3474.50 | 3474.60 | 0 |
2019-07-29 | Multi-Stage Fracture | 3426.50 | 3426.60 | 0 |
2019-07-29 | Multi-Stage Fracture | 3378.60 | 3378.70 | 0 |
2019-07-29 | Multi-Stage Fracture | 3331.40 | 3331.50 | 0 |
2019-07-29 | Multi-Stage Fracture | 3283.50 | 3283.60 | 0 |
2019-07-29 | Multi-Stage Fracture | 3235.70 | 3235.80 | 0 |
2019-07-29 | Multi-Stage Fracture | 3187.80 | 3187.90 | 0 |
2019-07-29 | Multi-Stage Fracture | 3139.90 | 3140.00 | 0 |
2019-07-26 | Multi-Stage Fracture | 5307.30 | 5307.40 | 0 |
2019-07-29 | Multi-Stage Fracture | 3092.00 | 3092.10 | 0 |
2019-07-26 | Multi-Stage Fracture | 5248.60 | 5248.70 | 0 |
2019-07-27 | Multi-Stage Fracture | 5189.20 | 5189.30 | 0 |
2019-07-27 | Multi-Stage Fracture | 5141.30 | 5141.40 | 0 |
2019-07-27 | Multi-Stage Fracture | 5093.40 | 5093.50 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-07-26 | 2019-07-29 | 2,834 | 23,488 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 86.9115 | N/A | |||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 10.8603 | N/A | ||
40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 2.7092 | N/A | ||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0088 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0088 | N/A | ||||
SCBO-2 (Breaker) | Step Energy Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0032 | N/A | |
Cured Acrylic Resin | Not Available | 100 | 0.0032 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0032 | N/A | ||||
SFS-1 (Clay Control) | Step Energy Services | Clay Control | Proprietary | Trade Secret | 100 | 0.1297 | N/A | |
Water | 7732-18-5 | 100 | 0.1297 | N/A | ||||
SFR-110 (Friction Reducer) | Step Energy Services | Friction Reducer | Mineral Oil | 8012-95-1 | 100 | 0.1102 | N/A | |
Polyacrylamide | 5/8/9003 | 100 | 0.1102 | N/A | ||||
Primary Alcohol Ethoxylatehigh | 68131-39-5 | 100 | 0.1102 | N/A | ||||
Sodium 2-Acryloylamino-2-methyl-1-propanesulfonic | 15214-89-8 | 100 | 0.1102 | N/A | ||||
Sodium Acrylate | 7446-81-3 | 100 | 0.1102 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1102 | N/A | ||||
SNE-8C (Non-Emulsifier) | Step Energy Services | Surfactant | Alkyl Sulfonic Acid | 11745 | 100 | 0.0427 | N/A | |
Methanol | 67-56-1 | 100 | 0.0427 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0427 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-07-19 | 2019-07-29 | Surface Water - Runoff | 993 |
2019-07-20 | 2019-07-29 | Surface Water - Runoff | 18520 |
2019-07-27 | 2019-07-31 | Surface Water - Runoff | 3539 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 1063 | 0.0 | 0.0 | 0.0 |
2020 | 1519 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-06-08 | No Incident Encountered | 0.00 | 0.00 |
2019-08-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]