X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686052405002

Well Details

Well ID: 0686052405002
Loading map...
Location: 00/05-24-068-05W6/2
Location Alias: 00/05-24-68-05 W6M
Location Alias 2: 00/05-24-068-05 W6/02
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 05
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: SCL HZ GOLDCK 5-24-68-5
Operator Name: Shell Canada Limited
License Number: 0449549
License Date: 2012-10-29
License Status: Amended
Spud Date: 2012-11-24
Final Drill Date: 2013-01-07
Well Total Depth: 4223.00 m
Surface Hole Latitude: 54.907310
Surface Hole Longitude: -118.658069

For data sources see[1][2]

Well History

Date Event
2012-10-29 Obtained License
2012-11-26 Surface Casing Operation Performed
2012-12-17 Direction Drilling Operation Performed - Deviate
2012-12-25 Direction Drilling Operation Performed - Horizontal
2012-12-27 Intermediate Casing Operation Performed
2013-01-07 Finished Drilling
2013-01-07 Well Mode changed to Drilled and Cased
2013-01-08 Well Log Performed
2013-01-09 Well Log Performed
2013-01-11 Liner Casing Operation Performed
2013-01-11 Production Casing Operation Performed
2013-01-13 Rig Released
2013-03-19 Perforation Treatment Performed - Open-Hole Completion
2013-03-19 Well Log Performed
2013-06-07 Perforation Treatment Performed - Multi-Stage Fracture
2013-06-08 Perforation Treatment Performed - Multi-Stage Fracture
2013-06-09 Perforation Treatment Performed - Multi-Stage Fracture
2013-06-10 Perforation Treatment Performed - Multi-Stage Fracture
2013-06-11 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-23 Well Began Production
2013-09-23 Well Fluid changed to Gas
2013-09-23 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-12-17 1978.00 Deviate (5 - 79 degrees)
2012-12-25 2513.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-19 Open Hole/Barefoot Completion 4203.50 4223.00 0
2013-06-09 Multi-Stage Fracture 3702.30 3703.60 0
2013-06-09 Multi-Stage Fracture 3637.10 3638.30 0
2013-06-09 Multi-Stage Fracture 3571.90 3573.10 0
2013-06-09 Multi-Stage Fracture 3506.70 3507.90 0
2013-06-09 Multi-Stage Fracture 3441.50 3442.70 0
2013-06-09 Multi-Stage Fracture 3376.40 3377.60 0
2013-06-09 Multi-Stage Fracture 3311.20 3312.40 0
2013-06-09 Multi-Stage Fracture 3246.00 3247.20 0
2013-06-09 Multi-Stage Fracture 3180.80 3182.00 0
2013-06-09 Multi-Stage Fracture 3127.70 3128.90 0
2013-06-07 Multi-Stage Fracture 4194.80 4195.90 0
2013-06-09 Multi-Stage Fracture 3062.50 3063.80 0
2013-06-09 Multi-Stage Fracture 2997.40 2998.60 0
2013-06-10 Multi-Stage Fracture 2944.30 2945.50 0
2013-06-11 Multi-Stage Fracture 2879.10 2880.40 0
2013-06-11 Multi-Stage Fracture 2814.00 2815.20 0
2013-06-11 Multi-Stage Fracture 2760.70 2761.90 0
2013-06-11 Multi-Stage Fracture 2695.50 2696.70 0
2013-06-11 Multi-Stage Fracture 2630.20 2631.40 0
2013-06-11 Multi-Stage Fracture 2577.00 2578.30 0
2013-06-07 Multi-Stage Fracture 4146.60 4147.80 0
2013-06-08 Multi-Stage Fracture 4093.50 4094.70 0
2013-06-08 Multi-Stage Fracture 4028.30 4029.50 0
2013-06-08 Multi-Stage Fracture 3963.00 3964.30 0
2013-06-08 Multi-Stage Fracture 3897.80 3899.10 0
2013-06-08 Multi-Stage Fracture 3832.60 3833.90 0
2013-06-09 Multi-Stage Fracture 3767.50 3768.70 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-06-07 2013-06-11 2,361 2,204 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 29.0118 N/A
water 7732-18-5 100 41.837 N/A
Prime Plus (30/50) Trican hexamethylenetetramine 100-97-0 100 4.4384 N/A
silica crystalline 14808-60-7 100 4.4384 N/A
Sand (30/50) Trican silica crystalline 14808-60-7 100 22.0439 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 0.5393 N/A
FCB-1 Trican Breaker severely refined mineral oil Trade Secret 100 0.0456 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0909 N/A
water 7732-18-5 100 0.0909 N/A
MS -1 Trican Solvent 2-butoxyethanol 111-76-2 100 0.5233 N/A
FC-1S Trican Surfactant isopropanol 67-63-0 100 1.1801 N/A
non-hazardous ingredients Not Available 100 1.1801 N/A
quaternary ammonium compound 7948 100 1.1801 N/A
FC-2 Trican Surfactant organic salt 7947 100 0.3808 N/A
water 7732-18-5 100 0.3808 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-05-27 2013-06-04 Surface Water - River 2289

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1930 0.0 0.0 0.0
2014 4671 0.0 0.0 0.0
2015 1020 0.0 0.0 0.0
2016 545 0.0 0.0 0.0
2017 4360 0.0 0.0 0.0
2018 6213 0.0 0.0 0.0
2019 5688 0.0 0.0 0.0
2020 1859 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-07 No Incident Encountered 0.00 0.00
2013-07-26 No Incident Encountered 0.00 0.00

For data sources see[9]

References