X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685252206002

Well Details

Well ID: 0685252206002
Loading map...
Location: 00/06-22-068-25W5/2
Location Alias: 00/06-22-68-25 W5M
Location Alias 2: 00/06-22-068-25 W5/02
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 25
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC ANTEN 6-22-68-25
Operator Name: ARC Resources Ltd.
License Number: 0448965
License Date: 2012-10-03
License Status: Amended
Spud Date: 2012-11-02
Final Drill Date: 2012-11-21
Well Total Depth: 3824.00 m
Surface Hole Latitude: 54.912491
Surface Hole Longitude: -117.704974

For data sources see[1][2]

Well History

Date Event
2012-10-03 Obtained License
2012-11-04 Surface Casing Operation Performed
2012-11-14 Direction Drilling Operation Performed - Deviate
2012-11-16 Intermediate Casing Operation Performed
2012-11-18 Direction Drilling Operation Performed - Horizontal
2012-11-21 Finished Drilling
2012-11-21 Well Mode changed to Drilled and Cased
2012-11-25 Liner Casing Operation Performed
2012-11-26 Rig Released
2012-12-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-15 Perforation Treatment Performed - Open-Hole Completion
2012-12-23 Well Began Production
2012-12-23 Well Fluid changed to Crude Oil
2012-12-23 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-11-14 1548.00 Deviate (5 - 79 degrees)
2012-11-18 1918.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-15 Open Hole/Barefoot Completion 2036.90 3824.00 0
2012-12-15 Multi-Stage Fracture 2997.50 2997.60 0
2012-12-15 Multi-Stage Fracture 2903.50 2903.60 0
2012-12-15 Multi-Stage Fracture 2776.50 2776.60 0
2012-12-15 Multi-Stage Fracture 2625.70 2625.80 0
2012-12-15 Multi-Stage Fracture 2474.90 2475.00 0
2012-12-15 Multi-Stage Fracture 2324.80 2324.90 0
2012-12-15 Multi-Stage Fracture 2175.20 2175.30 0
2012-12-15 Multi-Stage Fracture 2036.90 2037.00 0
2012-12-15 Multi-Stage Fracture 3741.10 3741.20 0
2012-12-15 Multi-Stage Fracture 3659.90 3660.00 0
2012-12-15 Multi-Stage Fracture 3578.50 3578.60 0
2012-12-15 Multi-Stage Fracture 3484.80 3484.90 0
2012-12-15 Multi-Stage Fracture 3391.00 3391.10 0
2012-12-15 Multi-Stage Fracture 3298.30 3298.40 0
2012-12-15 Multi-Stage Fracture 3194.30 3194.40 0
2012-12-15 Multi-Stage Fracture 3101.50 3101.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 216 0.0 0.0 0.0
2013 6892 0.0 0.0 0.0
2014 7591 0.0 0.0 0.0
2015 8438 0.0 0.0 0.0
2016 8236 0.0 0.0 0.0
2017 7421 0.0 0.0 0.0
2018 6851 0.0 0.0 0.0
2019 7838 0.0 0.0 0.0
2020 1744 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-25 No Incident Encountered 0.00 0.00
2012-12-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References