X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685101616002

Well Details

Well ID: 0685101616002
Loading map...
Location: 00/16-16-068-10W5/2
Location Alias: 00/16-16-68-10 W5M
Location Alias 2: 00/16-16-068-10 W5/02
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 10
Section: 16
County/Municipality: Big Lakes County
Well Name: Aquisition Oil SWANH 10-16-68-10
Operator Name: Acquisition Oil Corp.
License Number: 0020507
License Date: 1961-03-03
License Status: Suspension
Spud Date: 2000-05-04
Final Drill Date: 2000-05-17
Well Total Depth: 2870.00 m
Surface Hole Latitude: 54.888729
Surface Hole Longitude: -115.460036

For data sources see[1][2]

Well History

Date Event
1961-03-03 Obtained License
2000-04-26 Direction Drilling Operation Performed - Horizontal
2000-05-16 Well Log Performed
2000-05-17 Finished Drilling
2000-05-21 Rig Released
2000-05-21 Well Mode changed to Drilled and Cased
2000-06-05 Perforation Treatment Performed - Open-Hole Completion
2000-06-05 Perforation Treatment Performed - Slotted Liner or Casing
2000-06-07 Liner Casing Operation Performed
2000-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-09 Well Began Production
2000-10-09 Well Fluid changed to Crude Oil
2000-10-09 Well Mode changed to Pumping
2001-01-23 Well Fluid changed to Crude Oil
2001-01-23 Well Mode changed to Suspended
2012-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-21 Plug Back Performed
2012-08-21 Well Fluid changed to Crude Oil
2012-08-21 Well Log Performed
2012-08-21 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-04-26 2323.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-06-05 Slotted Liner 2323.50 2412.40 0
2000-06-05 Open Hole/Barefoot Completion 2412.40 2870.00 0
2000-06-08 Acid Treatment 2323.50 2870.00 0
2012-08-21 Packing Device Capped w/Cement 2262.00 2270.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1438 0.0 0.0 0.0
2001 342 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-21 No Incident Encountered 0.00 0.00

For data sources see[7]

References