X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685091815000

Well Details

Well ID: 0685091815000
Loading map...
Location: 00/15-18-068-09W5/0
Location Alias: 00/15-18-68-09 W5M
Location Alias 2: 00/15-18-068-09 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 09
Section: 18
County/Municipality: Big Lakes County
Well Name: 1976082 SWANH 15-18-68-9
Operator Name: Razor Energy Corp.
License Number: 0440799
License Date: 2011-12-09
License Status: Issued
Spud Date: 2012-06-28
Final Drill Date: 2012-07-11
Well Total Depth: 3674.00 m
Surface Hole Latitude: 54.881552
Surface Hole Longitude: -115.346827

For data sources see[1][2]

Well History

Date Event
2011-12-09 Obtained License
2012-03-07 Well Log Performed
2012-06-29 Surface Casing Operation Performed
2012-07-01 Direction Drilling Operation Performed - Deviate
2012-07-03 Well Log Performed
2012-07-05 Direction Drilling Operation Performed - Horizontal
2012-07-07 Intermediate Casing Operation Performed
2012-07-11 Finished Drilling
2012-07-11 Well Mode changed to Drilled and Cased
2012-07-13 Liner Casing Operation Performed
2012-07-13 Rig Released
2012-07-13 Well Log Performed
2012-11-10 Well Log Performed
2012-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-14 Perforation Treatment Performed - Open-Hole Completion
2012-11-15 Well Began Production
2012-11-15 Well Fluid changed to Crude Oil
2012-11-15 Well Mode changed to Flowing
2019-07-01 Well Fluid changed to Crude Oil
2019-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-28 Precision Drilling Corporation 281 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-01 1962.40 Deviate (5 - 79 degrees)
2012-07-05 2451.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-14 Open Hole/Barefoot Completion 3673.00 3674.00 0
2012-11-14 Multi-Stage Fracture 2929.00 2929.10 0
2012-11-14 Multi-Stage Fracture 2827.80 2827.90 0
2012-11-14 Multi-Stage Fracture 2740.00 2740.10 0
2012-11-14 Multi-Stage Fracture 2652.50 2652.60 0
2012-11-14 Multi-Stage Fracture 2565.10 2565.20 0
2012-11-14 Multi-Stage Fracture 3641.80 3641.90 0
2012-11-14 Multi-Stage Fracture 3554.30 3554.40 0
2012-11-14 Multi-Stage Fracture 3453.50 3453.60 0
2012-11-14 Multi-Stage Fracture 3366.70 3366.80 0
2012-11-14 Multi-Stage Fracture 3279.00 3279.10 0
2012-11-14 Multi-Stage Fracture 3191.70 3191.80 0
2012-11-14 Multi-Stage Fracture 3104.50 3104.60 0
2012-11-14 Multi-Stage Fracture 3016.80 3016.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 310 0.0 0.0 0.0
2013 7780 0.0 0.0 0.0
2014 7823 0.0 0.0 0.0
2015 7745 0.0 0.0 0.0
2016 5688 0.0 0.0 0.0
2017 8499 0.0 0.0 0.0
2018 5977 0.0 0.0 0.0
2019 8051 0.0 0.0 0.0
2020 2083 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-13 No Incident Encountered 0.00 0.00
2012-12-06 No Incident Encountered 0.00 0.00

For data sources see[8]

References