X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685091713000

Well Details

Well ID: 0685091713000
Loading map...
Location: 00/13-17-068-09W5/0
Location Alias: 00/13-17-68-09 W5M
Location Alias 2: 00/13-17-068-09 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 09
Section: 17
County/Municipality: Big Lakes County
Well Name: 1976082 SWANH 13-17-68-9
Operator Name: Razor Energy Corp.
License Number: 0439645
License Date: 2011-11-24
License Status: Issued
Spud Date: 2012-07-15
Final Drill Date: 2012-07-27
Well Total Depth: 3431.00 m
Surface Hole Latitude: 54.881457
Surface Hole Longitude: -115.346662

For data sources see[1][2]

Well History

Date Event
2011-11-24 Obtained License
2012-07-16 Surface Casing Operation Performed
2012-07-20 Direction Drilling Operation Performed - Deviate
2012-07-20 Well Log Performed
2012-07-22 Direction Drilling Operation Performed - Horizontal
2012-07-24 Intermediate Casing Operation Performed
2012-07-24 Well Log Performed
2012-07-27 Finished Drilling
2012-07-27 Well Mode changed to Drilled and Cased
2012-07-28 Liner Casing Operation Performed
2012-07-29 Rig Released
2012-11-20 Well Log Performed
2012-11-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-30 Well Began Production
2012-11-30 Well Fluid changed to Crude Oil
2012-11-30 Well Mode changed to Flowing
2019-07-01 Well Fluid changed to Crude Oil
2019-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-15 Precision Drilling Corporation 281 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-20 1977.00 Deviate (5 - 79 degrees)
2012-07-22 2393.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-26 Multi-Stage Fracture 3399.90 3400.00 0
2012-11-26 Multi-Stage Fracture 2648.10 2648.20 0
2012-11-26 Multi-Stage Fracture 2573.60 2573.70 0
2012-11-26 Multi-Stage Fracture 2485.60 2485.70 0
2012-11-26 Multi-Stage Fracture 3325.30 3325.40 0
2012-11-26 Multi-Stage Fracture 3237.60 3237.70 0
2012-11-26 Multi-Stage Fracture 3149.80 3149.90 0
2012-11-26 Multi-Stage Fracture 3075.10 3075.20 0
2012-11-26 Multi-Stage Fracture 2987.10 2987.20 0
2012-11-26 Multi-Stage Fracture 2898.90 2899.00 0
2012-11-26 Multi-Stage Fracture 2824.20 2824.30 0
2012-11-26 Multi-Stage Fracture 2736.10 2736.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 96 0.0 0.0 0.0
2013 7777 0.0 0.0 0.0
2014 6018 0.0 0.0 0.0
2015 7646 0.0 0.0 0.0
2016 4170 0.0 0.0 0.0
2017 8461 0.0 0.0 0.0
2018 8209 0.0 0.0 0.0
2019 8394 0.0 0.0 0.0
2020 2055 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-29 No Incident Encountered 0.00 0.00
2012-12-03 No Incident Encountered 0.00 0.00

For data sources see[8]

References