X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685091604000

Well Details

Well ID: 0685091604000
Loading map...
Location: 00/04-16-068-09W5/0
Location Alias: 00/04-16-68-09 W5M
Location Alias 2: 00/04-16-068-09 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 09
Section: 16
County/Municipality: Big Lakes County
Well Name: 1976082 SWANH 4-16-68-9
Operator Name: Razor Energy Corp.
License Number: 0025316
License Date: 1963-12-11
License Status: Abandoned
Spud Date: 1964-01-09
Final Drill Date: 1964-01-24
Well Total Depth: 2269.20 m
Surface Hole Latitude: 54.881516
Surface Hole Longitude: -115.319912

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-12-11 Obtained License
1964-01-24 Finished Drilling
1964-01-24 Well Mode changed to Drilled and Cased
1964-01-26 Production Casing Operation Performed
1964-02-02 Perforation Treatment Performed - Bullet Perforation
1964-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-04 Well Began Production
1964-02-04 Well Fluid changed to Crude Oil
1964-02-04 Well Mode changed to Flowing
1973-06-15 Well Fluid changed to Crude Oil
1973-06-15 Well Mode changed to Pumping
1980-10-01 Well Fluid changed to Crude Oil
1980-10-01 Well Mode changed to Suspended
1984-03-20 Well Fluid changed to Crude Oil
1984-03-20 Well Mode changed to Pumping
1993-05-08 Perforation Treatment Performed - Jet Perforation
2005-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-25 Perforation Treatment Performed - Jet Perforation
2005-02-25 Plug Back Performed
2005-02-25 Well Fluid changed to Crude Oil
2005-02-25 Well Log Performed
2005-02-25 Well Mode changed to Abandoned Zone
2005-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-27 Perforation Treatment Performed - Jet Perforation
2005-02-27 Perforation Treatment Performed - Remedial Casing
2005-02-27 Well Log Performed
2005-02-28 Perforation Treatment Performed - Jet Perforation
2005-02-28 Well Log Performed
2005-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-01 Perforation Treatment Performed - Remedial Casing
2005-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-02 Perforation Treatment Performed - Jet Perforation
2005-03-02 Perforation Treatment Performed - Remedial Casing
2005-03-02 Well Log Performed
2005-03-03 Perforation Treatment Performed - Jet Perforation
2005-03-03 Well Log Performed
2005-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-04 Perforation Treatment Performed - Remedial Casing
2005-03-05 Perforation Treatment Performed - Jet Perforation
2005-03-05 Well Log Performed
2005-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-06 Perforation Treatment Performed - Remedial Casing
2005-03-07 Well Abandoned
2005-03-07 Well Fluid changed to Crude Oil
2005-03-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-02-02 Bullet Perforation 2225.60 2228.10 7
2005-02-25 Perforation 910.00 911.00 12
2005-02-27 Perforation 880.00 881.00 13
2005-02-27 Remedial Casing Cementing 910.00 911.00 0
2005-02-27 Remedial Casing Cementing 880.00 881.00 0
2005-02-27 Packing Device Capped w/Cement 792.20 907.00 0
2005-02-28 Perforation 758.00 759.00 12
2005-03-01 Remedial Casing Cementing 758.00 759.00 0
2005-03-01 Packing Device Capped w/Cement 688.90 750.00 0
2005-03-02 Perforation 439.00 440.00 12
2005-03-02 Perforation 335.00 336.00 12
1964-02-02 Bullet Perforation 2230.50 2231.10 7
2005-03-02 Remedial Casing Cementing 335.00 440.00 0
2005-03-02 Packing Device Capped w/Cement 299.80 435.00 0
2005-03-03 Perforation 265.00 266.00 12
2005-03-04 Remedial Casing Cementing 265.00 266.00 0
2005-03-04 Packing Device Capped w/Cement 249.60 263.30 0
2005-03-05 Perforation 222.00 223.00 12
2005-03-05 Perforation 180.00 181.00 12
2005-03-06 Remedial Casing Cementing 180.00 223.00 0
2005-03-06 Packing Device Capped w/Cement 105.40 219.00 0
1964-02-02 Bullet Perforation 2242.10 2244.50 7
1964-02-03 Acid Treatment 2225.60 2244.50 0
1993-05-08 Perforation 2228.70 2231.50 13
1993-05-08 Perforation 2233.60 2236.70 13
1993-05-08 Perforation 2241.20 2249.80 13
1993-05-08 Perforation 2251.00 2256.40 13
2005-02-25 Packing Device Capped w/Cement 2207.00 2217.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6431 0.0 0.0 0.0
1968 6477 0.0 0.0 0.0
1969 8122 0.0 0.0 0.0
1970 8682 0.0 0.0 0.0
1971 8420 0.0 0.0 0.0
1972 8503 0.0 0.0 0.0
1973 8564 0.0 0.0 0.0
1974 7725 0.0 0.0 0.0
1975 7872 0.0 0.0 0.0
1976 7982 0.0 0.0 0.0
1977 7688 0.0 0.0 0.0
1978 7819 0.0 0.0 0.0
1979 96 0.0 0.0 0.0
1984 952 0.0 0.0 0.0
1985 6179 0.0 0.0 0.0
1986 6315 0.0 0.0 0.0
1987 8036 0.0 0.0 0.0
1988 5960 0.0 0.0 0.0
1989 7476 0.0 0.0 0.0
1990 6029 0.0 0.0 0.0
1991 6490 0.0 0.0 0.0
1992 7928 0.0 0.0 0.0
1993 7253 0.0 0.0 0.0
1994 7824 0.0 0.0 0.0
1995 7105 0.0 0.0 0.0
1996 6816 0.0 0.0 0.0
1997 8609 0.0 0.0 0.0
1998 8508 0.0 0.0 0.0
1999 8010 0.0 0.0 0.0
2000 8340 0.0 0.0 0.0
2001 4177 0.0 0.0 0.0

For data sources see[5]

References