If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0685090115000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.849133,"lon":-115.235388,"icon":""}]} |
| Location: 00/15-01-068-09W5/0 | |
| Location Alias: 00/15-01-68-09 W5M | |
| Location Alias 2: 00/15-01-068-09 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 068 | |
| Meridian: 5 | |
| Range: 09 | |
| Section: 01 | |
| County/Municipality: Big Lakes County | |
| Well Name: ASPENLEAF 14-36 HZ SWANH 15-1-68-9 | |
| Operator Name: Aspenleaf Energy Limited | |
| License Number: 0437831 | |
| License Date: 2011-10-20 | |
| License Status: Issued | |
| Spud Date: 2011-11-09 | |
| Final Drill Date: 2011-11-25 | |
| Well Total Depth: 4002.00 m | |
| Surface Hole Latitude: 54.849133 | |
| Surface Hole Longitude: -115.235388 |
| Date | Event |
|---|---|
| 2011-10-20 | Obtained License |
| 2011-11-11 | Surface Casing Operation Performed |
| 2011-11-12 | Well Log Performed |
| 2011-11-15 | Direction Drilling Operation Performed - Horizontal |
| 2011-11-18 | Intermediate Casing Operation Performed |
| 2011-11-25 | Finished Drilling |
| 2011-11-25 | Well Log Performed |
| 2011-11-25 | Well Mode changed to Drilled and Cased |
| 2011-11-27 | Liner Casing Operation Performed |
| 2011-11-27 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-11-28 | Rig Released |
| 2012-01-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-02-19 | Well Began Production |
| 2012-02-19 | Well Fluid changed to Crude Oil |
| 2012-02-19 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-11-15 | 2125.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-11-27 | Open Hole/Barefoot Completion | 3998.00 | 4002.00 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3139.50 | 3140.30 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3192.50 | 3193.60 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3255.50 | 3256.30 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3309.20 | 3310.40 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3361.90 | 3362.70 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3415.50 | 3416.60 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3468.40 | 3469.20 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3532.30 | 3533.10 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3583.50 | 3584.30 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3646.90 | 3648.00 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 2687.60 | 2688.40 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3699.40 | 3700.20 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3753.30 | 3754.40 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3805.10 | 3805.90 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3868.90 | 3870.00 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3920.30 | 3921.10 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3978.50 | 3979.50 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 2749.70 | 2750.50 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 2800.70 | 2801.50 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 2854.20 | 2855.30 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 2918.00 | 2918.80 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 2969.60 | 2970.80 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3023.00 | 3023.80 | 0 |
| 2012-01-24 | Multi-Stage Fracture | 3087.10 | 3088.20 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 6846 | 0.0 | 0.0 | 0.0 |
| 2013 | 8248 | 0.0 | 0.0 | 0.0 |
| 2014 | 6365 | 0.0 | 0.0 | 0.0 |
| 2015 | 6968 | 0.0 | 0.0 | 0.0 |
| 2016 | 6669 | 0.0 | 0.0 | 0.0 |
| 2017 | 7576 | 0.0 | 0.0 | 0.0 |
| 2018 | 7823 | 0.0 | 0.0 | 0.0 |
| 2019 | 420 | 0.0 | 0.0 | 0.0 |
| 2020 | 1711 | 0.0 | 0.0 | 0.0 |
For data sources see[6]