If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0685081713000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.880434,"lon":-115.181071,"icon":""}]} |
Location: 00/13-17-068-08W5/0 | |
Location Alias: 00/13-17-68-08 W5M | |
Location Alias 2: 00/13-17-068-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 5 | |
Range: 08 | |
Section: 17 | |
County/Municipality: Big Lakes County | |
Well Name: ASPENLEAF 2-17 HZ SWANH 13-17-68-8 | |
Operator Name: Aspenleaf Energy Limited | |
License Number: 0420047 | |
License Date: 2010-04-23 | |
License Status: Issued | |
Spud Date: 2010-05-16 | |
Final Drill Date: 2010-06-18 | |
Well Total Depth: 4008.00 m | |
Surface Hole Latitude: 54.880434 | |
Surface Hole Longitude: -115.181071 |
Date | Event |
---|---|
2001-02-12 | Well Log Performed |
2010-04-23 | Obtained License |
2010-05-17 | Surface Casing Operation Performed |
2010-05-24 | Direction Drilling Operation Performed - Horizontal |
2010-05-28 | Well Log Performed |
2010-06-03 | Intermediate Casing Operation Performed |
2010-06-18 | Finished Drilling |
2010-06-18 | Well Log Performed |
2010-06-18 | Well Mode changed to Drilled and Cased |
2010-06-20 | Liner Casing Operation Performed |
2010-06-20 | Perforation Treatment Performed - Open-Hole Completion |
2010-06-24 | Rig Released |
2010-08-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-08-22 | Well Log Performed |
2010-09-14 | Well Began Production |
2010-09-14 | Well Fluid changed to Crude Oil |
2010-09-14 | Well Mode changed to Pumping |
2011-01-31 | Perforation Treatment Performed - Jet Perforation |
2011-01-31 | Well Log Performed |
2011-02-02 | Perforation Treatment Performed - Jet Perforation |
2011-02-02 | Well Log Performed |
2011-02-03 | Perforation Treatment Performed - Jet Perforation |
2011-02-03 | Well Log Performed |
2011-02-04 | Perforation Treatment Performed - Jet Perforation |
2011-02-04 | Well Log Performed |
2011-02-05 | Perforation Treatment Performed - Jet Perforation |
2011-02-09 | Perforation Treatment Performed - Jet Perforation |
2011-02-09 | Well Log Performed |
2011-02-10 | Perforation Treatment Performed - Jet Perforation |
2011-02-10 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-05-24 | 2250.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-06-20 | Open Hole/Barefoot Completion | 2620.50 | 4008.00 | 0 |
2010-08-09 | Multi-Stage Fracture | 3165.20 | 3165.30 | 0 |
2010-08-09 | Multi-Stage Fracture | 3069.00 | 3069.10 | 0 |
2010-08-09 | Multi-Stage Fracture | 2972.50 | 2972.60 | 0 |
2010-08-09 | Multi-Stage Fracture | 2862.60 | 2862.70 | 0 |
2010-08-09 | Multi-Stage Fracture | 2765.40 | 2765.50 | 0 |
2010-08-09 | Multi-Stage Fracture | 2668.80 | 2668.90 | 0 |
2011-01-31 | Perforation | 2825.00 | 2827.00 | 20 |
2011-01-31 | Perforation | 2816.00 | 2818.00 | 20 |
2011-01-31 | Perforation | 2728.00 | 2730.00 | 20 |
2011-01-31 | Perforation | 2718.50 | 2720.50 | 20 |
2010-08-09 | Multi-Stage Fracture | 3956.70 | 3956.80 | 0 |
2011-01-31 | Perforation | 2630.50 | 2632.50 | 20 |
2011-02-02 | Perforation | 2921.50 | 2923.50 | 20 |
2011-02-02 | Perforation | 2911.00 | 2913.00 | 20 |
2011-02-03 | Perforation | 3817.00 | 3818.00 | 10 |
2011-02-03 | Perforation | 3807.00 | 3808.00 | 10 |
2011-02-03 | Perforation | 3720.00 | 3721.00 | 10 |
2011-02-04 | Perforation | 3712.00 | 3713.00 | 10 |
2011-02-04 | Perforation | 3611.50 | 3612.50 | 10 |
2011-02-04 | Perforation | 3603.00 | 3604.00 | 10 |
2011-02-04 | Perforation | 3514.50 | 3515.50 | 10 |
2010-08-09 | Multi-Stage Fracture | 3853.80 | 3853.90 | 0 |
2011-02-05 | Perforation | 3505.00 | 3506.00 | 10 |
2011-02-05 | Perforation | 3417.00 | 3418.00 | 10 |
2011-02-05 | Perforation | 3408.00 | 3409.00 | 10 |
2011-02-05 | Perforation | 3311.00 | 3312.00 | 10 |
2011-02-09 | Perforation | 3223.50 | 3224.50 | 10 |
2011-02-09 | Perforation | 3215.00 | 3216.00 | 10 |
2011-02-09 | Perforation | 3113.00 | 3114.00 | 10 |
2011-02-10 | Perforation | 3106.80 | 3107.30 | 10 |
2011-02-10 | Perforation | 3018.50 | 3019.50 | 10 |
2011-02-10 | Perforation | 3009.60 | 3010.60 | 10 |
2010-08-09 | Multi-Stage Fracture | 3758.00 | 3758.10 | 0 |
2010-08-09 | Multi-Stage Fracture | 3661.20 | 3661.30 | 0 |
2010-08-09 | Multi-Stage Fracture | 3564.10 | 3564.20 | 0 |
2010-08-09 | Multi-Stage Fracture | 3467.50 | 3467.60 | 0 |
2010-08-09 | Multi-Stage Fracture | 3358.60 | 3358.70 | 0 |
2010-08-09 | Multi-Stage Fracture | 3261.30 | 3261.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2165 | 0.0 | 0.0 | 0.0 |
2011 | 6526 | 0.0 | 0.0 | 0.0 |
2012 | 8391 | 0.0 | 0.0 | 0.0 |
2013 | 7572 | 0.0 | 0.0 | 0.0 |
2014 | 8146 | 0.0 | 0.0 | 0.0 |
2015 | 6548 | 0.0 | 0.0 | 0.0 |
2016 | 8650 | 0.0 | 0.0 | 0.0 |
2017 | 7798 | 0.0 | 0.0 | 0.0 |
2018 | 7855 | 0.0 | 0.0 | 0.0 |
2019 | 7930 | 0.0 | 0.0 | 0.0 |
2020 | 1777 | 0.0 | 0.0 | 0.0 |
For data sources see[6]