X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685081713000

Well Details

Well ID: 0685081713000
Loading map...
Location: 00/13-17-068-08W5/0
Location Alias: 00/13-17-68-08 W5M
Location Alias 2: 00/13-17-068-08 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 08
Section: 17
County/Municipality: Big Lakes County
Well Name: ASPENLEAF 2-17 HZ SWANH 13-17-68-8
Operator Name: Aspenleaf Energy Limited
License Number: 0420047
License Date: 2010-04-23
License Status: Issued
Spud Date: 2010-05-16
Final Drill Date: 2010-06-18
Well Total Depth: 4008.00 m
Surface Hole Latitude: 54.880434
Surface Hole Longitude: -115.181071

For data sources see[1][2]

Well History

Date Event
2001-02-12 Well Log Performed
2010-04-23 Obtained License
2010-05-17 Surface Casing Operation Performed
2010-05-24 Direction Drilling Operation Performed - Horizontal
2010-05-28 Well Log Performed
2010-06-03 Intermediate Casing Operation Performed
2010-06-18 Finished Drilling
2010-06-18 Well Log Performed
2010-06-18 Well Mode changed to Drilled and Cased
2010-06-20 Liner Casing Operation Performed
2010-06-20 Perforation Treatment Performed - Open-Hole Completion
2010-06-24 Rig Released
2010-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-22 Well Log Performed
2010-09-14 Well Began Production
2010-09-14 Well Fluid changed to Crude Oil
2010-09-14 Well Mode changed to Pumping
2011-01-31 Perforation Treatment Performed - Jet Perforation
2011-01-31 Well Log Performed
2011-02-02 Perforation Treatment Performed - Jet Perforation
2011-02-02 Well Log Performed
2011-02-03 Perforation Treatment Performed - Jet Perforation
2011-02-03 Well Log Performed
2011-02-04 Perforation Treatment Performed - Jet Perforation
2011-02-04 Well Log Performed
2011-02-05 Perforation Treatment Performed - Jet Perforation
2011-02-09 Perforation Treatment Performed - Jet Perforation
2011-02-09 Well Log Performed
2011-02-10 Perforation Treatment Performed - Jet Perforation
2011-02-10 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-05-24 2250.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-06-20 Open Hole/Barefoot Completion 2620.50 4008.00 0
2010-08-09 Multi-Stage Fracture 3165.20 3165.30 0
2010-08-09 Multi-Stage Fracture 3069.00 3069.10 0
2010-08-09 Multi-Stage Fracture 2972.50 2972.60 0
2010-08-09 Multi-Stage Fracture 2862.60 2862.70 0
2010-08-09 Multi-Stage Fracture 2765.40 2765.50 0
2010-08-09 Multi-Stage Fracture 2668.80 2668.90 0
2011-01-31 Perforation 2825.00 2827.00 20
2011-01-31 Perforation 2816.00 2818.00 20
2011-01-31 Perforation 2728.00 2730.00 20
2011-01-31 Perforation 2718.50 2720.50 20
2010-08-09 Multi-Stage Fracture 3956.70 3956.80 0
2011-01-31 Perforation 2630.50 2632.50 20
2011-02-02 Perforation 2921.50 2923.50 20
2011-02-02 Perforation 2911.00 2913.00 20
2011-02-03 Perforation 3817.00 3818.00 10
2011-02-03 Perforation 3807.00 3808.00 10
2011-02-03 Perforation 3720.00 3721.00 10
2011-02-04 Perforation 3712.00 3713.00 10
2011-02-04 Perforation 3611.50 3612.50 10
2011-02-04 Perforation 3603.00 3604.00 10
2011-02-04 Perforation 3514.50 3515.50 10
2010-08-09 Multi-Stage Fracture 3853.80 3853.90 0
2011-02-05 Perforation 3505.00 3506.00 10
2011-02-05 Perforation 3417.00 3418.00 10
2011-02-05 Perforation 3408.00 3409.00 10
2011-02-05 Perforation 3311.00 3312.00 10
2011-02-09 Perforation 3223.50 3224.50 10
2011-02-09 Perforation 3215.00 3216.00 10
2011-02-09 Perforation 3113.00 3114.00 10
2011-02-10 Perforation 3106.80 3107.30 10
2011-02-10 Perforation 3018.50 3019.50 10
2011-02-10 Perforation 3009.60 3010.60 10
2010-08-09 Multi-Stage Fracture 3758.00 3758.10 0
2010-08-09 Multi-Stage Fracture 3661.20 3661.30 0
2010-08-09 Multi-Stage Fracture 3564.10 3564.20 0
2010-08-09 Multi-Stage Fracture 3467.50 3467.60 0
2010-08-09 Multi-Stage Fracture 3358.60 3358.70 0
2010-08-09 Multi-Stage Fracture 3261.30 3261.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2165 0.0 0.0 0.0
2011 6526 0.0 0.0 0.0
2012 8391 0.0 0.0 0.0
2013 7572 0.0 0.0 0.0
2014 8146 0.0 0.0 0.0
2015 6548 0.0 0.0 0.0
2016 8650 0.0 0.0 0.0
2017 7798 0.0 0.0 0.0
2018 7855 0.0 0.0 0.0
2019 7930 0.0 0.0 0.0
2020 1777 0.0 0.0 0.0

For data sources see[6]

References