X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685080913000

Well Details

Well ID: 0685080913000
Loading map...
Location: 00/13-09-068-08W5/0
Location Alias: 00/13-09-68-08 W5M
Location Alias 2: 00/13-09-068-08 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 08
Section: 09
County/Municipality: Big Lakes County
Well Name: ASPENLEAF 1-9 HZ SWANH 13-9-68-8
Operator Name: Aspenleaf Energy Limited
License Number: 0424182
License Date: 2010-10-05
License Status: Amended
Spud Date: 2011-02-08
Final Drill Date: 2011-03-04
Well Total Depth: 4005.00 m
Surface Hole Latitude: 54.866082
Surface Hole Longitude: -115.146974

For data sources see[1][2]

Well History

Date Event
2010-10-05 Obtained License
2011-02-10 Surface Casing Operation Performed
2011-02-14 Direction Drilling Operation Performed - Horizontal
2011-02-18 Well Log Performed
2011-02-21 Intermediate Casing Operation Performed
2011-03-04 Finished Drilling
2011-03-04 Well Log Performed
2011-03-04 Well Mode changed to Drilled and Cased
2011-03-12 Liner Casing Operation Performed
2011-03-12 Perforation Treatment Performed - Open-Hole Completion
2011-03-13 Rig Released
2011-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-16 Well Began Production
2011-09-16 Well Fluid changed to Crude Oil
2011-09-16 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-14 1997.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-12 Open Hole/Barefoot Completion 4001.00 4005.00 0
2011-09-15 Multi-Stage Fracture 3379.50 3380.30 0
2011-09-15 Multi-Stage Fracture 3489.20 3490.00 0
2011-09-15 Multi-Stage Fracture 3610.30 3611.10 0
2011-09-15 Multi-Stage Fracture 3720.10 3720.90 0
2011-09-15 Multi-Stage Fracture 3829.00 3829.80 0
2011-09-15 Multi-Stage Fracture 3952.90 3953.70 0
2011-09-15 Multi-Stage Fracture 2470.00 2470.80 0
2011-09-15 Multi-Stage Fracture 2578.70 2579.50 0
2011-09-15 Multi-Stage Fracture 2688.00 2688.80 0
2011-09-15 Multi-Stage Fracture 2809.50 2810.30 0
2011-09-15 Multi-Stage Fracture 2918.20 2919.00 0
2011-09-15 Multi-Stage Fracture 3038.50 3039.30 0
2011-09-15 Multi-Stage Fracture 3148.00 3148.80 0
2011-09-15 Multi-Stage Fracture 3270.20 3271.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2040 0.0 0.0 0.0
2012 7792 0.0 0.0 0.0
2013 7296 0.0 0.0 0.0
2014 7045 0.0 0.0 0.0
2015 6357 0.0 0.0 0.0
2016 8434 0.0 0.0 0.0
2017 8192 0.0 0.0 0.0
2018 7490 0.0 0.0 0.0
2019 8638 0.0 0.0 0.0
2020 2087 0.0 0.0 0.0

For data sources see[6]

References