X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685080906000

Well Details

Well ID: 0685080906000
Loading map...
Location: 00/06-09-068-08W5/0
Location Alias: 00/06-09-68-08 W5M
Location Alias 2: 00/06-09-068-08 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 08
Section: 09
County/Municipality: Big Lakes County
Well Name: ASPENLEAF 2-17 HZ SWANH 6-9-68-8
Operator Name: Aspenleaf Energy Limited
License Number: 0420049
License Date: 2010-04-23
License Status: Amended
Spud Date: 2010-06-25
Final Drill Date: 2010-07-20
Well Total Depth: 4005.00 m
Surface Hole Latitude: 54.880396
Surface Hole Longitude: -115.180832

For data sources see[1][2]

Well History

Date Event
2010-04-23 Obtained License
2010-06-27 Surface Casing Operation Performed
2010-07-04 Direction Drilling Operation Performed - Horizontal
2010-07-08 Well Log Performed
2010-07-11 Intermediate Casing Operation Performed
2010-07-19 Lost Circulation Occurred
2010-07-20 Finished Drilling
2010-07-20 Well Log Performed
2010-07-20 Well Mode changed to Drilled and Cased
2010-07-22 Well Log Performed
2010-07-25 Liner Casing Operation Performed
2010-07-25 Perforation Treatment Performed - Open-Hole Completion
2010-07-26 Rig Released
2010-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-11 Well Log Performed
2010-08-15 Well Began Production
2010-08-15 Well Fluid changed to Crude Oil
2010-08-15 Well Mode changed to Pumping
2010-10-30 Well Log Performed
2014-04-01 Well Log Performed
2014-04-02 Well Log Performed
2014-10-10 Well Began Injection
2014-10-10 Well Fluid changed to Water
2014-10-10 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-04 2171.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-07-25 Open Hole/Barefoot Completion 2659.00 4005.00 0
2010-08-08 Multi-Stage Fracture 3479.40 3479.50 0
2010-08-08 Multi-Stage Fracture 3575.60 3575.70 0
2010-08-08 Multi-Stage Fracture 3671.90 3672.00 0
2010-08-08 Multi-Stage Fracture 3766.00 3766.10 0
2010-08-08 Multi-Stage Fracture 3861.40 3861.50 0
2010-08-08 Multi-Stage Fracture 3952.10 3952.20 0
2010-08-08 Multi-Stage Fracture 2710.20 2710.30 0
2010-08-08 Multi-Stage Fracture 2805.20 2805.30 0
2010-08-08 Multi-Stage Fracture 2901.20 2901.30 0
2010-08-08 Multi-Stage Fracture 2998.60 2998.70 0
2010-08-08 Multi-Stage Fracture 3095.20 3095.30 0
2010-08-08 Multi-Stage Fracture 3191.00 3191.10 0
2010-08-08 Multi-Stage Fracture 3286.50 3286.60 0
2010-08-08 Multi-Stage Fracture 3382.90 3383.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2562 0.0 0.0 0.0
2011 7676 0.0 0.0 0.0
2012 7268 0.0 0.0 0.0
2013 6408 0.0 0.0 0.0
2014 1273 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-07-19 Lost Circulation 3779.00 4005.00
2014-04-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References