If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0684173005000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.91275,"lon":-112.593904,"icon":""}]} |
| Location: 00/05-30-068-17W4/0 | |
| Location Alias: 00/05-30-68-17 W4M | |
| Location Alias 2: 00/05-30-068-17 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 068 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 30 | |
| County/Municipality: Athabasca County | |
| Well Name: RENAISSANCE ATMORE 5-30-68-17 | |
| Operator Name: Husky Oil Operations Limited | |
| License Number: 0170007 | |
| License Date: 1994-08-30 | |
| License Status: Abandoned | |
| Spud Date: 1994-09-13 | |
| Final Drill Date: 1994-09-17 | |
| Well Total Depth: 505.00 m | |
| Surface Hole Latitude: 54.912750 | |
| Surface Hole Longitude: -112.593904 |
| Date | Event |
|---|---|
| 1994-08-30 | Obtained License |
| 1994-09-13 | Surface Casing Operation Performed |
| 1994-09-17 | Finished Drilling |
| 1994-09-17 | Well Log Performed |
| 1994-09-18 | Plug Back Performed |
| 1994-09-18 | Rig Released |
| 1994-09-18 | Well Abandoned |
| 1994-09-18 | Well Mode changed to Abandoned |
| 1995-02-23 | Perforation Treatment Performed - Jet Perforation |
| 1995-02-23 | Perforation Treatment Performed - Remedial Casing |
| 1995-03-13 | Perforation Treatment Performed - Jet Perforation |
| 1995-03-13 | Perforation Treatment Performed - Remedial Casing |
| 2014-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-03-10 | Plug Back Performed |
| 2014-03-10 | Well Log Performed |
| 2016-03-11 | Well Log Performed |
| 2016-03-12 | Production Casing Operation Performed |
| 2016-03-13 | Perforation Treatment Performed - Cement Plug |
| 2016-03-14 | Well Log Performed |
| 2017-02-11 | Well Log Performed |
| 2017-02-13 | Perforation Treatment Performed - Jet Perforation |
| 2017-02-13 | Well Log Performed |
| 2017-02-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-02-15 | Perforation Treatment Performed - Cement Plug |
| 2017-02-15 | Perforation Treatment Performed - Remedial Casing |
| 2018-02-23 | Perforation Treatment Performed - Jet Perforation |
| 2018-02-23 | Well Log Performed |
| 2018-03-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2018-03-07 | Perforation Treatment Performed - Cement Plug |
| 2018-03-07 | Perforation Treatment Performed - Remedial Casing |
| 2018-03-08 | Perforation Treatment Performed - Jet Perforation |
| 2018-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2018-03-10 | Perforation Treatment Performed - Cement Plug |
| 2018-03-10 | Perforation Treatment Performed - Remedial Casing |
| 2018-03-10 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1995-02-23 | Perforation | 47.00 | 48.00 | 13 |
| 2017-02-15 | Remedial Casing Cementing | 157.00 | 160.00 | 0 |
| 2017-02-15 | Cement Plug | 152.30 | 160.00 | 0 |
| 2017-02-15 | Packing Device Capped w/Cement | 139.50 | 152.00 | 0 |
| 2018-02-23 | Perforation | 105.00 | 108.00 | 17 |
| 2018-03-07 | Remedial Casing Cementing | 105.00 | 108.00 | 0 |
| 2018-03-07 | Cement Plug | 100.00 | 108.00 | 0 |
| 2018-03-07 | Packing Device Capped w/Cement | 92.00 | 100.00 | 0 |
| 2018-03-08 | Perforation | 44.00 | 47.00 | 17 |
| 2018-03-10 | Remedial Casing Cementing | 44.00 | 47.00 | 0 |
| 2018-03-10 | Cement Plug | 39.00 | 92.00 | 0 |
| 1995-02-23 | Remedial Casing Cementing | 47.00 | 48.00 | 0 |
| 2018-03-10 | Packing Device Capped w/Cement | 30.00 | 39.00 | 0 |
| 1995-03-13 | Perforation | 46.00 | 47.00 | 13 |
| 1995-03-13 | Remedial Casing Cementing | 46.00 | 47.00 | 0 |
| 2014-03-10 | Packing Device Capped w/Cement | 90.00 | 98.00 | 0 |
| 2014-03-10 | Packing Device Capped w/Cement | 14.00 | 75.00 | 0 |
| 2016-03-13 | Cement Plug | 268.00 | 282.00 | 0 |
| 2017-02-13 | Perforation | 157.00 | 160.00 | 20 |
| 2017-02-13 | Perforation | 157.00 | 160.00 | 17 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-03-12 | No Incident Encountered | 0.00 | 0.00 |
| 2016-03-14 | No Incident Encountered | 0.00 | 0.00 |
| 2017-02-16 | No Incident Encountered | 0.00 | 0.00 |
| 2018-03-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]