X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684052501022

Well Details

Well ID: 0684052501022
Loading map...
Location: 02/01-25-068-05W4/2
Location Alias: 02/01-25-68-05 W4M
Location Alias 2: 02/01-25-068-05 W4/02
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 05
Section: 25
County/Municipality: Improvement District No. 349
Well Name: CNRL 2A55 PRIMROSE 1-30-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0345973
License Date: 2005-12-19
License Status: Amended
Spud Date: 2006-03-28
Final Drill Date: 2006-07-05
Well Total Depth: 2087.00 m
Surface Hole Latitude: 54.913163
Surface Hole Longitude: -110.592740

For data sources see[1][2]

Well History

Date Event
2005-12-19 Obtained License
2006-03-29 Surface Casing Operation Performed
2006-05-04 Direction Drilling Operation Performed - Horizontal
2006-05-12 Direction Drilling Operation Performed - Horizontal
2006-05-13 Intermediate Casing Operation Performed
2006-05-13 Well Log Performed
2006-07-05 Finished Drilling
2006-07-05 Well Log Performed
2006-07-05 Well Mode changed to Drilled and Cased
2006-07-06 Liner Casing Operation Performed
2006-07-06 Perforation Treatment Performed - Open-Hole Completion
2006-07-06 Perforation Treatment Performed - Slotted Liner or Casing
2006-07-06 Rig Released
2006-09-25 Well Log Performed
2007-10-01 Well Began Production
2007-10-01 Well Fluid changed to Crude Bitumen
2007-10-01 Well Type changed to Cyclical
2010-02-06 Well Log Performed
2012-03-29 Perforation Treatment Performed - Jet Perforation
2012-03-30 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-05-04 150.00 Horizontal
2006-05-12 616.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-07-06 Slotted Liner 852.00 2082.00 0
2012-03-29 Perforation 1900.00 1901.00 6
2012-03-29 Perforation 1966.90 1967.90 6
2012-03-29 Perforation 2020.60 2021.60 6
2012-03-30 Perforation 870.60 871.60 6
2012-03-30 Perforation 937.10 938.10 6
2012-03-30 Perforation 1003.60 1004.60 6
2012-03-30 Perforation 1057.30 1058.30 6
2012-03-30 Perforation 1137.60 1138.60 6
2012-03-30 Perforation 1191.00 1192.00 6
2012-03-30 Perforation 1258.20 1259.20 6
2006-07-06 Open Hole/Barefoot Completion 2082.00 2087.00 0
2012-03-30 Perforation 1312.00 1313.00 6
2012-03-30 Perforation 1365.50 1366.50 6
2012-03-29 Perforation 1432.30 1433.30 6
2012-03-29 Perforation 1499.40 1500.40 6
2012-03-29 Perforation 1565.60 1566.60 6
2012-03-29 Perforation 1633.30 1634.30 6
2012-03-29 Perforation 1700.10 1701.10 6
2012-03-29 Perforation 1766.80 1767.80 6
2012-03-29 Perforation 1833.10 1834.10 6

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 926 0.0 0.0 0.0
2008 6902 0.0 0.0 0.0
2009 8727 0.0 0.0 0.0
2010 5762 0.0 0.0 0.0
2011 8752 0.0 0.0 0.0
2012 8517 0.0 0.0 0.0
2013 6982 0.0 0.0 0.0
2014 7819 0.0 0.0 0.0
2015 7588 0.0 0.0 0.0
2016 8734 0.0 0.0 0.0
2017 6902 0.0 0.0 0.0
2018 6758 0.0 0.0 0.0
2019 7723 0.0 0.0 0.0
2020 2106 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-31 No Incident Encountered 0.00 0.00

For data sources see[7]

References