If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0684042705000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.911943,"lon":-110.53822,"icon":""}]} |
Location: 00/05-27-068-04W4/0 | |
Location Alias: 00/05-27-68-04 W4M | |
Location Alias 2: 00/05-27-068-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 4 | |
Range: 04 | |
Section: 27 | |
County/Municipality: Improvement District No. 349 | |
Well Name: CNRL OBS TF 65 FISHER 5-27-68-4 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0444533 | |
License Date: 2012-02-28 | |
License Status: Amended | |
Spud Date: 2012-10-12 | |
Final Drill Date: 2012-10-14 | |
Well Total Depth: 463.00 m | |
Surface Hole Latitude: 54.911943 | |
Surface Hole Longitude: -110.538220 |
Date | Event |
---|---|
2012-02-28 | Obtained License |
2012-10-13 | Surface Casing Operation Performed |
2012-10-13 | Well Log Performed |
2012-10-14 | Finished Drilling |
2012-10-14 | Well Mode changed to Drilled and Cased |
2012-10-15 | Production Casing Operation Performed |
2012-10-15 | Rig Released |
2012-10-15 | Well Log Performed |
2014-01-22 | Perforation Treatment Performed - Jet Perforation |
2014-01-23 | Perforation Treatment Performed - Jet Perforation |
2014-01-27 | Well Type changed to Observation |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-10-12 | Groundforce Geodrilling Solutions Inc. | 9 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-01-22 | Perforation | 456.00 | 460.00 | 13 |
2014-01-23 | Perforation | 437.00 | 442.00 | 13 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-15 | No Incident Encountered | 0.00 | 0.00 |
2014-01-27 | No Incident Encountered | 0.00 | 0.00 |
2014-06-15 | No Incident Encountered | 0.00 | 0.00 |
2018-04-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]