X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684042006020

Well Details

Well ID: 0684042006020
Loading map...
Location: 02/06-20-068-04W4/0
Location Alias: 02/06-20-68-04 W4M
Location Alias 2: 02/06-20-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 20
County/Municipality: Improvement District No. 349
Well Name: CNRL PAD 54 3B54 PRIMROSE 6-20-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0327894
License Date: 2005-03-10
License Status: Issued
Spud Date: 2005-05-12
Final Drill Date: 2005-06-26
Well Total Depth: 542.00 m
Surface Hole Latitude: 54.899133
Surface Hole Longitude: -110.582706

For data sources see[1][2]

Well History

Date Event
2005-03-10 Obtained License
2005-05-12 Surface Casing Operation Performed
2005-06-25 Direction Drilling Operation Performed - Deviate
2005-06-26 Finished Drilling
2005-06-26 Well Log Performed
2005-06-26 Well Mode changed to Drilled and Cased
2005-06-27 Production Casing Operation Performed
2005-06-27 Rig Released
2006-07-04 Perforation Treatment Performed - Jet Perforation
2006-07-04 Well Log Performed
2006-07-14 Well Began Production
2006-07-14 Well Fluid changed to Crude Bitumen
2006-07-14 Well Type changed to Cyclical
2009-09-25 Well Log Performed
2009-09-26 Well Log Performed
2009-09-27 Well Log Performed
2009-10-27 Well Log Performed
2009-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-30 Perforation Treatment Performed - Jet Perforation
2009-10-30 Well Log Performed
2009-10-31 Perforation Treatment Performed - Jet Perforation
2010-09-30 Well Fluid changed to Crude Bitumen
2010-09-30 Well Mode changed to Suspended
2010-09-30 Well Type changed to Cyclical
2013-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-12-01 Well Type changed to Observation
2016-08-15 Well Log Performed
2016-08-16 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-06-25 177.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-07-04 Perforation 535.00 536.00 26
2006-07-04 Perforation 529.00 532.00 26
2009-10-28 Packing Device Capped w/Cement 502.00 527.00 0
2009-10-30 Perforation 492.00 495.00 26
2009-10-31 Perforation 475.00 478.00 26
2013-11-24 Packing Device Capped w/Cement 500.00 502.00 0
2016-08-16 Perforation 467.00 471.00 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 2026 0.0 0.0 0.0
2007 7785 0.0 0.0 0.0
2008 6578 0.0 0.0 0.0
2009 7012 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-25 No Incident Encountered 0.00 0.00
2016-08-17 No Incident Encountered 0.00 0.00

For data sources see[7]

References