If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0684041811000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.88596,"lon":-110.581184,"icon":""}]} |
Location: 00/11-18-068-04W4/0 | |
Location Alias: 00/11-18-68-04 W4M | |
Location Alias 2: 00/11-18-068-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 4 | |
Range: 04 | |
Section: 18 | |
County/Municipality: Improvement District No. 349 | |
Well Name: CNRL 5A53 PRIMROSE 11-18-68-4 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0319092 | |
License Date: 2004-11-17 | |
License Status: Issued | |
Spud Date: 2005-03-24 | |
Final Drill Date: 2005-06-23 | |
Well Total Depth: 1884.00 m | |
Surface Hole Latitude: 54.885960 | |
Surface Hole Longitude: -110.581184 |
Date | Event |
---|---|
2004-11-17 | Obtained License |
2005-03-24 | Surface Casing Operation Performed |
2005-06-15 | Direction Drilling Operation Performed - Horizontal |
2005-06-16 | Well Log Performed |
2005-06-17 | Intermediate Casing Operation Performed |
2005-06-23 | Finished Drilling |
2005-06-23 | Well Log Performed |
2005-06-23 | Well Mode changed to Drilled and Cased |
2005-06-24 | Liner Casing Operation Performed |
2005-06-24 | Perforation Treatment Performed - Open-Hole Completion |
2005-06-24 | Perforation Treatment Performed - Slotted Liner or Casing |
2005-06-24 | Rig Released |
2006-02-18 | Well Log Performed |
2006-06-01 | Well Began Production |
2006-06-01 | Well Fluid changed to Crude Bitumen |
2006-06-01 | Well Type changed to Cyclical |
2011-03-04 | Well Log Performed |
2011-03-08 | Well Log Performed |
2011-03-13 | Perforation Treatment Performed - Jet Perforation |
2011-03-14 | Perforation Treatment Performed - Jet Perforation |
2011-03-15 | Perforation Treatment Performed - Jet Perforation |
2011-03-16 | Perforation Treatment Performed - Jet Perforation |
2011-03-17 | Perforation Treatment Performed - Jet Perforation |
2011-03-21 | Perforation Treatment Performed - Jet Perforation |
2011-03-22 | Perforation Treatment Performed - Jet Perforation |
2011-03-23 | Perforation Treatment Performed - Jet Perforation |
2011-03-24 | Perforation Treatment Performed - Jet Perforation |
2012-05-13 | Perforation Treatment Performed - Jet Perforation |
2012-05-14 | Perforation Treatment Performed - Jet Perforation |
2016-06-29 | Production Casing Operation Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-06-15 | 250.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-06-24 | Slotted Liner | 645.00 | 1879.00 | 0 |
2011-03-15 | Perforation | 1650.50 | 1651.50 | 3 |
2011-03-16 | Perforation | 1593.30 | 1594.30 | 3 |
2011-03-16 | Perforation | 1585.20 | 1586.20 | 3 |
2011-03-16 | Perforation | 1528.30 | 1529.30 | 3 |
2011-03-16 | Perforation | 1520.20 | 1521.20 | 3 |
2011-03-17 | Perforation | 1463.10 | 1464.10 | 3 |
2011-03-17 | Perforation | 1397.50 | 1398.50 | 3 |
2011-03-17 | Perforation | 1389.40 | 1390.40 | 3 |
2011-03-21 | Perforation | 1332.60 | 1333.60 | 3 |
2011-03-21 | Perforation | 1324.50 | 1325.50 | 3 |
2005-06-24 | Open Hole/Barefoot Completion | 1879.00 | 1884.00 | 0 |
2011-03-21 | Perforation | 1266.70 | 1267.70 | 3 |
2011-03-21 | Perforation | 1258.60 | 1259.60 | 3 |
2011-03-22 | Perforation | 1201.20 | 1202.20 | 3 |
2011-03-22 | Perforation | 1193.10 | 1194.10 | 3 |
2011-03-22 | Perforation | 1137.10 | 1138.10 | 3 |
2011-03-22 | Perforation | 1129.00 | 1130.00 | 3 |
2011-03-23 | Perforation | 1072.00 | 1073.00 | 3 |
2011-03-23 | Perforation | 1063.90 | 1064.90 | 3 |
2011-03-23 | Perforation | 1006.40 | 1007.40 | 3 |
2011-03-23 | Perforation | 998.30 | 999.30 | 3 |
2011-03-13 | Perforation | 1829.60 | 1830.60 | 3 |
2011-03-23 | Perforation | 940.80 | 941.80 | 3 |
2011-03-23 | Perforation | 932.70 | 933.70 | 3 |
2011-03-24 | Perforation | 875.10 | 876.10 | 3 |
2011-03-24 | Perforation | 867.00 | 868.00 | 3 |
2011-03-24 | Perforation | 810.10 | 811.10 | 3 |
2011-03-24 | Perforation | 802.00 | 803.00 | 3 |
2011-03-24 | Perforation | 757.50 | 758.50 | 3 |
2011-03-24 | Perforation | 749.40 | 750.40 | 3 |
2012-05-13 | Perforation | 1845.10 | 1846.10 | 6 |
2012-05-13 | Perforation | 1766.30 | 1767.30 | 6 |
2011-03-13 | Perforation | 1821.60 | 1822.60 | 3 |
2012-05-13 | Perforation | 1713.80 | 1714.80 | 6 |
2012-05-13 | Perforation | 1661.00 | 1662.00 | 6 |
2012-05-13 | Perforation | 1595.60 | 1596.60 | 6 |
2012-05-13 | Perforation | 1530.70 | 1531.70 | 6 |
2012-05-13 | Perforation | 1465.60 | 1466.60 | 6 |
2012-05-13 | Perforation | 1399.80 | 1400.80 | 6 |
2012-05-13 | Perforation | 1334.90 | 1335.90 | 6 |
2012-05-14 | Perforation | 1269.20 | 1270.20 | 6 |
2012-05-14 | Perforation | 1203.60 | 1204.60 | 6 |
2012-05-14 | Perforation | 1139.30 | 1140.30 | 6 |
2011-03-14 | Perforation | 1776.90 | 1777.90 | 3 |
2012-05-14 | Perforation | 1074.40 | 1075.40 | 6 |
2012-05-14 | Perforation | 1008.80 | 1009.80 | 6 |
2012-05-14 | Perforation | 943.20 | 944.20 | 6 |
2012-05-14 | Perforation | 877.60 | 878.60 | 6 |
2012-05-14 | Perforation | 812.40 | 813.40 | 6 |
2012-05-14 | Perforation | 759.90 | 760.90 | 6 |
2012-05-14 | Perforation | 694.60 | 695.60 | 6 |
2011-03-14 | Perforation | 1768.80 | 1769.80 | 3 |
2011-03-15 | Perforation | 1711.30 | 1712.30 | 3 |
2011-03-15 | Perforation | 1703.20 | 1704.20 | 3 |
2011-03-15 | Perforation | 1658.60 | 1659.60 | 3 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 3632 | 0.0 | 0.0 | 0.0 |
2007 | 8078 | 0.0 | 0.0 | 0.0 |
2008 | 6890 | 0.0 | 0.0 | 0.0 |
2009 | 6434 | 0.0 | 0.0 | 0.0 |
2010 | 8750 | 0.0 | 0.0 | 0.0 |
2011 | 7775 | 0.0 | 0.0 | 0.0 |
2012 | 8504 | 0.0 | 0.0 | 0.0 |
2013 | 6664 | 0.0 | 0.0 | 0.0 |
2014 | 8605 | 0.0 | 0.0 | 0.0 |
2015 | 8169 | 0.0 | 0.0 | 0.0 |
2016 | 5581 | 0.0 | 0.0 | 0.0 |
2017 | 8521 | 0.0 | 0.0 | 0.0 |
2018 | 7316 | 0.0 | 0.0 | 0.0 |
2019 | 7700 | 0.0 | 0.0 | 0.0 |
2020 | 132 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-15 | No Incident Encountered | 0.00 | 0.00 |
2016-07-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]