X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041606040

Well Details

Well ID: 0684041606040
Loading map...
Location: 04/06-16-068-04W4/0
Location Alias: 04/06-16-68-04 W4M
Location Alias 2: 04/06-16-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 16
County/Municipality: Improvement District No. 349
Well Name: CNRL 15A59 PRIMROSE 6-16-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0401750
License Date: 2008-10-02
License Status: Issued
Spud Date: 2008-12-10
Final Drill Date: 2009-05-04
Well Total Depth: 2088.00 m
Surface Hole Latitude: 54.880322
Surface Hole Longitude: -110.528318

For data sources see[1][2]

Well History

Date Event
2008-10-02 Obtained License
2008-12-11 Surface Casing Operation Performed
2009-02-05 Direction Drilling Operation Performed - Horizontal
2009-02-07 Intermediate Casing Operation Performed
2009-02-07 Well Log Performed
2009-05-04 Finished Drilling
2009-05-04 Liner Casing Operation Performed
2009-05-04 Well Log Performed
2009-05-04 Well Mode changed to Drilled and Cased
2009-05-05 Perforation Treatment Performed - Open-Hole Completion
2009-05-05 Perforation Treatment Performed - Slotted Liner or Casing
2009-05-05 Rig Released
2009-10-27 Well Log Performed
2010-10-01 Well Began Production
2010-10-01 Well Fluid changed to Crude Bitumen
2010-10-01 Well Type changed to Cyclical
2011-02-21 Well Log Performed
2011-09-25 Well Log Performed
2012-08-09 Well Log Performed
2012-08-12 Well Log Performed
2012-10-28 Perforation Treatment Performed - Jet Perforation
2012-10-29 Perforation Treatment Performed - Jet Perforation
2018-07-11 Well Log Performed
2018-07-22 Production Casing Operation Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-02-05 124.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-05-05 Slotted Liner 830.00 2083.00 0
2012-10-28 Perforation 1622.80 1623.80 3
2012-10-28 Perforation 1566.50 1567.50 3
2012-10-28 Perforation 1509.50 1510.50 3
2012-10-28 Perforation 1452.70 1453.70 3
2012-10-28 Perforation 1395.70 1396.70 3
2012-10-29 Perforation 1338.90 1339.90 3
2012-10-29 Perforation 1282.50 1283.50 3
2012-10-29 Perforation 1225.70 1226.70 3
2012-10-29 Perforation 1169.00 1170.00 3
2012-10-29 Perforation 1056.40 1057.40 3
2009-05-05 Open Hole/Barefoot Completion 2083.00 2088.00 0
2012-10-29 Perforation 1000.60 1001.60 3
2012-10-29 Perforation 943.50 944.50 3
2012-10-29 Perforation 887.80 888.80 3
2012-10-29 Perforation 845.60 846.60 3
2012-10-28 Perforation 2018.20 2019.20 3
2012-10-28 Perforation 1962.50 1963.50 3
2012-10-28 Perforation 1905.80 1906.80 3
2012-10-28 Perforation 1849.30 1850.30 3
2012-10-28 Perforation 1792.50 1793.50 3
2012-10-28 Perforation 1735.80 1736.80 3
2012-10-28 Perforation 1679.10 1680.10 3

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 566 0.0 0.0 0.0
2011 6864 0.0 0.0 0.0
2012 5666 0.0 0.0 0.0
2013 8705 0.0 0.0 0.0
2014 5533 0.0 0.0 0.0
2015 6730 0.0 0.0 0.0
2016 8592 0.0 0.0 0.0
2017 3664 0.0 0.0 0.0
2018 3587 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References