X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684040105022

Well Details

Well ID: 0684040105022
Loading map...
Location: 02/05-01-068-04W4/2
Location Alias: 02/05-01-68-04 W4M
Location Alias 2: 02/05-01-068-04 W4/02
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 01
County/Municipality: Improvement District No. 349
Well Name: CNRL 8C31 PRIMROSE 6-2-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0301754
License Date: 2004-01-15
License Status: Amended
Spud Date: 2004-02-25
Final Drill Date: 2004-06-02
Well Total Depth: 2231.00 m
Surface Hole Latitude: 54.850382
Surface Hole Longitude: -110.506039

For data sources see[1][2]

Well History

Date Event
2004-01-15 Obtained License
2004-02-26 Surface Casing Operation Performed
2004-05-20 Direction Drilling Operation Performed - Horizontal
2004-05-23 Intermediate Casing Operation Performed
2004-05-29 Direction Drilling Operation Performed - Horizontal
2004-06-02 Finished Drilling
2004-06-02 Well Mode changed to Drilled and Cased
2004-06-03 Well Log Performed
2004-06-04 Liner Casing Operation Performed
2004-06-04 Perforation Treatment Performed - Open-Hole Completion
2004-06-04 Perforation Treatment Performed - Slotted Liner or Casing
2004-06-04 Rig Released
2005-07-05 Well Began Production
2005-07-05 Well Fluid changed to Crude Bitumen
2005-07-05 Well Type changed to Cyclical
2013-04-13 Perforation Treatment Performed - Jet Perforation
2013-04-14 Perforation Treatment Performed - Jet Perforation
2018-01-31 Well Fluid changed to Crude Bitumen
2018-01-31 Well Mode changed to Suspended
2018-01-31 Well Type changed to Cyclical
2018-08-01 Well Fluid changed to Crude Bitumen
2018-08-01 Well Type changed to Cyclical
2018-09-15 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-05-20 150.00 Horizontal
2004-05-29 859.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-06-04 Slotted Liner 859.20 2220.00 0
2013-04-13 Perforation 1741.40 1742.40 6
2013-04-13 Perforation 1806.50 1807.50 6
2013-04-13 Perforation 1871.80 1872.80 6
2013-04-14 Perforation 929.60 930.60 6
2013-04-14 Perforation 994.90 995.90 6
2013-04-14 Perforation 1111.90 1112.90 6
2013-04-14 Perforation 1188.10 1189.10 6
2004-06-04 Open Hole/Barefoot Completion 2220.00 2231.00 0
2013-04-13 Perforation 1264.50 1265.50 6
2013-04-13 Perforation 1329.20 1330.20 6
2013-04-13 Perforation 1392.10 1393.10 6
2013-04-13 Perforation 1456.40 1457.40 6
2013-04-13 Perforation 1521.80 1522.80 6
2013-04-13 Perforation 1585.90 1586.90 6
2013-04-13 Perforation 1650.60 1651.60 6

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 3126 0.0 0.0 0.0
2006 7205 0.0 0.0 0.0
2007 6257 0.0 0.0 0.0
2008 8711 0.0 0.0 0.0
2009 8088 0.0 0.0 0.0
2010 5914 0.0 0.0 0.0
2011 7818 0.0 0.0 0.0
2012 8556 0.0 0.0 0.0
2013 8117 0.0 0.0 0.0
2014 5964 0.0 0.0 0.0
2015 8016 0.0 0.0 0.0
2016 8722 0.0 0.0 0.0
2017 8555 0.0 0.0 0.0
2018 3321 0.0 0.0 0.0
2019 4436 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-05-06 No Incident Encountered 0.00 0.00
2013-04-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References