X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675241307020

Well Details

Well ID: 0675241307020
Loading map...
Location: 02/07-13-067-24W5/0
Location Alias: 02/07-13-67-24 W5M
Location Alias 2: 02/07-13-067-24 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 24
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC ANTEN 7-13-67-24
Operator Name: ARC Resources Ltd.
License Number: 0418700
License Date: 2010-02-19
License Status: Issued
Spud Date: 2010-05-28
Final Drill Date: 2010-06-14
Well Total Depth: 2900.00 m
Surface Hole Latitude: 54.791791
Surface Hole Longitude: -117.505769

For data sources see[1][2]

Well History

Date Event
2010-02-19 Obtained License
2010-05-30 Surface Casing Operation Performed
2010-06-01 Well Log Performed
2010-06-02 Direction Drilling Operation Performed - Horizontal
2010-06-11 Intermediate Casing Operation Performed
2010-06-12 Well Log Performed
2010-06-14 Finished Drilling
2010-06-14 Well Log Performed
2010-06-14 Well Mode changed to Drilled and Cased
2010-06-15 Liner Casing Operation Performed
2010-06-16 Rig Released
2010-06-23 Well Log Performed
2010-07-17 Perforation Treatment Performed - Multi-Stage Fracture
2010-07-17 Perforation Treatment Performed - Open-Hole Completion
2010-07-21 Well Log Performed
2010-09-12 Well Began Production
2010-09-12 Well Fluid changed to Gas
2010-09-12 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-06-02 1488.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-07-17 Open Hole/Barefoot Completion 2114.00 2900.00 0
2010-07-17 Multi-Stage Fracture 2834.10 2834.20 0
2010-07-17 Multi-Stage Fracture 2745.00 2745.10 0
2010-07-17 Multi-Stage Fracture 2646.00 2646.10 0
2010-07-17 Multi-Stage Fracture 2559.00 2559.10 0
2010-07-17 Multi-Stage Fracture 2461.00 2461.10 0
2010-07-17 Multi-Stage Fracture 2363.00 2363.10 0
2010-07-17 Multi-Stage Fracture 2277.00 2277.10 0
2010-07-17 Multi-Stage Fracture 2178.00 2178.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2587 0.0 0.0 0.0
2011 7826 0.0 0.0 0.0
2012 8299 0.0 0.0 0.0
2013 8496 0.0 0.0 0.0
2014 5521 0.0 0.0 0.0
2015 6360 0.0 0.0 0.0
2016 7922 0.0 0.0 0.0
2017 7988 0.0 0.0 0.0
2018 3834 0.0 0.0 0.0
2019 8218 0.0 0.0 0.0
2020 1991 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-07-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References