X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675112502000

Well Details

Well ID: 0675112502000
Loading map...
Location: 00/02-25-067-11W5/0
Location Alias: 00/02-25-67-11 W5M
Location Alias 2: 00/02-25-067-11 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 11
Section: 25
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 2-25-67-11
Operator Name: Canadian Natural Resources Limited
License Number: 0020346
License Date: 1961-01-27
License Status: Issued
Spud Date: 1961-01-31
Final Drill Date: 1961-02-23
Well Total Depth: 2670.00 m
Surface Hole Latitude: 54.823598
Surface Hole Longitude: -115.535851

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-01-27 Obtained License
1961-02-23 Finished Drilling
1961-02-23 Well Mode changed to Drilled and Cased
1961-02-24 Perforation Treatment Performed - Permeator Perforation
1961-02-24 Production Casing Operation Performed
1961-03-01 Perforation Treatment Performed - Acid Wash - No Pressure
1961-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-07 Well Began Production
1961-03-07 Well Fluid changed to Crude Oil
1961-03-07 Well Mode changed to Flowing
1970-01-29 Perforation Treatment Performed - Jet Perforation
1970-01-30 Perforation Treatment Performed - Acid Wash - No Pressure
1970-02-24 Well Began Injection
1970-02-24 Well Fluid changed to Solvent
1970-02-24 Well Type changed to Injection
1973-02-06 Perforation Treatment Performed - Jet Perforation
1973-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-10 Perforation Treatment Performed - Acid Wash - No Pressure
1976-08-13 Well Log Performed
1977-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-26 Well Log Performed
1985-06-10 Well Log Performed
1985-06-22 Perforation Treatment Performed - Fractured
1985-06-25 Well Log Performed
1986-03-18 Well Log Performed
1993-06-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-02-24 Permeator Perforation 2625.50 2632.30 13
1970-01-29 Perforation 2589.60 2611.50 7
1970-01-30 Acid Wash 2589.60 2659.10 0
1973-02-06 Perforation 2578.60 2582.30 7
1973-02-06 Perforation 2582.90 2585.90 7
1973-02-10 Acid Wash 2657.90 2659.40 0
1973-02-10 Acid Treatment 2648.70 2659.40 0
1973-02-10 Acid Treatment 2621.30 2641.10 0
1973-02-10 Acid Treatment 2572.50 2599.90 0
1977-08-08 Acid Treatment 2578.60 2659.10 0
1977-12-07 Acid Treatment 2578.60 2655.40 0
1961-02-24 Permeator Perforation 2602.10 2608.80 13
1977-12-20 Acid Treatment 2578.60 2655.40 0
1978-01-21 Acid Treatment 2578.60 2659.10 0
1978-02-12 Acid Treatment 2578.60 2659.10 0
1978-03-16 Acid Treatment 2578.60 2659.10 0
1978-03-31 Acid Treatment 2578.60 2659.10 0
1978-05-14 Acid Treatment 2578.60 2659.10 0
1978-06-04 Acid Treatment 2578.60 2659.10 0
1978-06-25 Acid Treatment 2578.60 2659.10 0
1985-06-22 Fracture 2582.90 2634.70 0
1961-02-24 Permeator Perforation 2584.70 2594.20 13
1961-03-01 Acid Wash 2584.70 2632.30 0
1961-03-02 Acid Treatment 2584.70 2594.20 0
1961-03-03 Acid Treatment 2584.70 2632.30 0
1961-03-04 Acid Treatment 2584.70 2594.20 0
1970-01-29 Perforation 2655.40 2659.10 7
1970-01-29 Perforation 2628.00 2634.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1330 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References