X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675103202000

Well Details

Well ID: 0675103202000
Loading map...
Location: 00/02-32-067-10W5/0
Location Alias: 00/02-32-67-10 W5M
Location Alias 2: 00/02-32-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 32
County/Municipality: Big Lakes County
Well Name: CNRL ET AL SWANH 2-32-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0018093
License Date: 1959-11-12
License Status: Suspension
Spud Date: 1959-11-17
Final Drill Date: 1959-12-20
Well Total Depth: 2563.70 m
Surface Hole Latitude: 54.837386
Surface Hole Longitude: -115.485093

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-11-12 Obtained License
1959-12-20 Finished Drilling
1959-12-20 Well Mode changed to Drilled and Cased
1959-12-21 Perforation Treatment Performed - Permeator Perforation
1959-12-21 Production Casing Operation Performed
1960-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-06 Perforation Treatment Performed - Jet Perforation
1960-02-06 Perforation Treatment Performed - Permeator Perforation
1960-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-14 Well Began Production
1960-02-14 Well Fluid changed to Crude Oil
1960-02-14 Well Mode changed to Flowing
1960-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-01-22 Perforation Treatment Performed - Jet Perforation
1971-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-01-30 Well Fluid changed to Crude Oil
1971-01-30 Well Mode changed to Pumping
1978-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-02 Perforation Treatment Performed - Cement Squeeze
1978-04-09 Perforation Treatment Performed - Jet Perforation
1978-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-12 Well Began Injection
1980-03-12 Well Fluid changed to Solvent
1980-03-12 Well Type changed to Injection
1985-06-04 Perforation Treatment Performed - Jet Perforation
1985-06-04 Well Log Performed
1985-06-06 Perforation Treatment Performed - Fractured
1985-09-12 Well Log Performed
1986-06-25 Well Log Performed
1989-11-09 Well Log Performed
1993-05-28 Well Log Performed
1998-02-04 Well Fluid changed to Solvent
1998-02-04 Well Mode changed to Suspended
1998-02-04 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-12-21 Permeator Perforation 2494.20 2506.40 7
1960-07-29 Acid Treatment 2548.10 2554.20 0
1960-07-30 Acid Treatment 2548.10 2554.20 0
1960-08-07 Acid Treatment 2494.20 2554.20 0
1971-01-22 Perforation 2518.60 2518.90 7
1971-01-22 Perforation 2519.20 2519.50 7
1971-01-22 Perforation 2521.90 2522.50 7
1971-01-22 Perforation 2523.10 2524.40 7
1971-01-22 Perforation 2526.50 2528.30 7
1971-01-22 Perforation 2509.40 2510.00 7
1971-01-22 Perforation 2510.90 2511.90 7
1959-12-21 Permeator Perforation 2546.60 2552.70 7
1971-01-22 Perforation 2512.50 2512.80 7
1971-01-22 Perforation 2514.90 2515.80 7
1971-01-22 Perforation 2517.30 2517.60 7
1971-01-22 Perforation 2477.10 2478.60 7
1971-01-22 Perforation 2479.20 2480.80 7
1971-01-22 Perforation 2484.40 2489.00 3
1971-01-22 Perforation 2465.20 2470.40 3
1971-01-22 Perforation 2471.00 2476.20 7
1971-01-23 Acid Treatment 2509.40 2554.20 0
1971-01-23 Acid Treatment 2465.20 2480.80 0
1960-02-03 Acid Treatment 2494.20 2552.70 0
1978-03-12 Acid Treatment 2465.20 2554.20 0
1978-04-02 Cement Squeeze 2465.20 2532.90 0
1978-04-09 Perforation 2496.00 2497.80 7
1978-04-09 Perforation 2498.80 2500.60 7
1978-04-09 Perforation 2501.80 2503.30 7
1978-04-09 Perforation 2504.80 2506.40 7
1978-04-09 Perforation 2514.30 2515.80 7
1978-04-09 Perforation 2519.20 2520.70 7
1978-04-09 Perforation 2525.60 2527.70 7
1978-04-10 Acid Treatment 2496.00 2527.70 0
1960-02-06 Acid Treatment 2494.20 2552.70 0
1985-06-04 Perforation 2522.40 2523.60 7
1985-06-04 Perforation 2488.30 2492.80 7
1985-06-04 Perforation 2477.90 2480.30 7
1985-06-04 Perforation 2476.10 2477.30 7
1985-06-06 Fracture 2476.10 2527.70 0
1960-02-06 Permeator Perforation 2546.90 2553.00 13
1960-02-06 Perforation 2548.10 2550.60 13
1960-02-06 Perforation 2550.60 2554.20 13
1960-02-07 Acid Treatment 2494.20 2554.20 0
1960-07-28 Acid Treatment 2548.10 2554.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1970 287 0.0 0.0 0.0
1971 6728 0.0 0.0 0.0
1972 8054 0.0 0.0 0.0
1973 8373 0.0 0.0 0.0
1974 7381 0.0 0.0 0.0
1975 7825 0.0 0.0 0.0
1976 8049 0.0 0.0 0.0
1977 2261 0.0 0.0 0.0
1978 3758 0.0 0.0 0.0
1979 6059 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

References