X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675102912000

Well Details

Well ID: 0675102912000
Loading map...
Location: 00/12-29-067-10W5/0
Location Alias: 00/12-29-67-10 W5M
Location Alias 2: 00/12-29-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 29
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 12-29-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0019479
License Date: 1960-08-04
License Status: Issued
Spud Date: 1960-08-29
Final Drill Date: 1960-09-17
Well Total Depth: 2584.10 m
Surface Hole Latitude: 54.830107
Surface Hole Longitude: -115.498782

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-08-04 Obtained License
1960-09-17 Finished Drilling
1960-09-17 Well Mode changed to Drilled and Cased
1960-09-19 Drill Stem Test Performed
1960-09-20 Perforation Treatment Performed - Open-Hole Completion
1960-09-20 Production Casing Operation Performed
1960-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-03 Perforation Treatment Performed - Jet Perforation
1960-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-04 Well Began Production
1960-11-04 Well Fluid changed to Crude Oil
1960-11-04 Well Mode changed to Flowing
1970-10-31 Perforation Treatment Performed - Jet Perforation
1970-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-11-08 Well Fluid changed to Crude Oil
1970-11-08 Well Mode changed to Pumping
1978-04-01 Well Log Performed
1988-09-14 Well Log Performed
1991-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-01 Well Log Performed
1991-08-21 Well Began Injection
1991-08-21 Well Fluid changed to Solvent
1991-08-21 Well Type changed to Injection
1991-08-28 Well Log Performed
1991-11-25 Well Log Performed
1993-06-28 Well Log Performed
1993-07-22 Well Log Performed
1993-10-12 Well Log Performed
1993-10-14 Perforation Treatment Performed - Condensate Squeeze
1993-11-30 Well Log Performed
1994-01-31 Well Log Performed
1995-06-23 Well Log Performed
1995-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-06 Perforation Treatment Performed - Cement Squeeze
1995-07-10 Perforation Treatment Performed - Jet Perforation
1995-07-10 Well Log Performed
1995-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-14 Well Log Performed
1995-11-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-09-20 Open Hole/Barefoot Completion 2575.60 2584.10 0
1970-10-31 Perforation 2551.80 2552.40 7
1970-10-31 Perforation 2547.50 2549.30 7
1970-10-31 Perforation 2534.10 2535.90 7
1970-10-31 Perforation 2531.70 2532.30 7
1970-10-31 Perforation 2530.10 2530.80 7
1970-10-31 Perforation 2528.00 2528.60 7
1970-10-31 Perforation 2526.80 2527.40 7
1970-10-31 Perforation 2525.00 2526.20 7
1970-10-31 Perforation 2521.60 2523.10 3
1970-10-31 Perforation 2517.00 2520.10 3
1960-10-01 Acid Treatment 2575.60 2581.00 0
1970-10-31 Perforation 2501.20 2503.00 7
1970-10-31 Perforation 2500.00 2500.30 7
1970-10-31 Perforation 2493.30 2497.80 3
1970-10-31 Perforation 2489.60 2492.70 3
1970-11-01 Acid Treatment 2489.60 2556.10 0
1991-02-27 Acid Treatment 2489.60 2584.10 0
1993-10-14 Condensate Squeeze 2489.60 2584.10 0
1995-07-04 Acid Treatment 2489.60 2508.50 0
1995-07-06 Cement Squeeze 2489.60 2508.50 0
1995-07-10 Perforation 2505.50 2510.00 13
1960-10-03 Perforation 2504.80 2508.50 7
1995-07-10 Perforation 2511.00 2514.00 13
1995-07-10 Perforation 2514.50 2521.00 13
1995-07-10 Perforation 2522.00 2524.00 13
1995-07-10 Perforation 2525.50 2529.50 13
1995-07-10 Perforation 2530.50 2532.00 13
1995-07-10 Perforation 2532.50 2533.00 13
1995-07-10 Perforation 2535.50 2537.00 13
1995-07-10 Perforation 2547.50 2550.50 13
1995-07-13 Acid Treatment 2505.50 2556.10 0
1960-10-03 Perforation 2510.00 2512.20 7
1960-10-03 Perforation 2514.00 2515.80 7
1960-10-04 Acid Treatment 2504.80 2515.80 0
1960-10-10 Acid Treatment 2575.60 2584.10 0
1970-10-31 Perforation 2555.10 2556.10 7
1970-10-31 Perforation 2552.70 2553.60 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1967 897 0.0 0.0 0.0
1968 29 0.0 0.0 0.0
1970 1182 0.0 0.0 0.0
1971 8160 0.0 0.0 0.0
1972 7781 0.0 0.0 0.0
1973 8371 0.0 0.0 0.0
1974 7564 0.0 0.0 0.0
1975 7548 0.0 0.0 0.0
1976 8299 0.0 0.0 0.0
1977 5478 0.0 0.0 0.0
1978 7990 0.0 0.0 0.0
1979 8092 0.0 0.0 0.0
1980 8271 0.0 0.0 0.0
1981 7394 0.0 0.0 0.0
1982 7681 0.0 0.0 0.0
1983 7196 0.0 0.0 0.0
1984 8531 0.0 0.0 0.0
1985 8227 0.0 0.0 0.0
1986 8263 0.0 0.0 0.0
1987 7330 0.0 0.0 0.0
1988 8226 0.0 0.0 0.0
1989 4847 0.0 0.0 0.0
1990 3323 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References