X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675102904000

Well Details

Well ID: 0675102904000
Loading map...
Location: 00/04-29-067-10W5/0
Location Alias: 00/04-29-67-10 W5M
Location Alias 2: 00/04-29-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 29
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 4-29-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0016193
License Date: 1958-11-07
License Status: Issued
Spud Date: 1958-11-25
Final Drill Date: 1958-12-26
Well Total Depth: 2575.30 m
Surface Hole Latitude: 54.823341
Surface Hole Longitude: -115.497979

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-11-07 Obtained License
1958-12-26 Finished Drilling
1958-12-26 Well Mode changed to Drilled and Cased
1958-12-29 Perforation Treatment Performed - Open-Hole Completion
1958-12-29 Production Casing Operation Performed
1959-01-22 Perforation Treatment Performed - Bullet Perforation
1959-01-23 Perforation Treatment Performed - Cement Squeeze
1959-01-25 Perforation Treatment Performed - Cement Squeeze
1959-01-25 Perforation Treatment Performed - Jet Perforation
1959-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-01-31 Perforation Treatment Performed - Jet Perforation
1959-02-02 Well Began Production
1959-02-02 Well Fluid changed to Crude Oil
1959-02-02 Well Mode changed to Flowing
1959-03-01 Well Type changed to Observation
1960-02-01 Well Fluid changed to Crude Oil
1960-02-01 Well Mode changed to Flowing
1970-10-30 Perforation Treatment Performed - Jet Perforation
1970-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-11-05 Well Fluid changed to Crude Oil
1970-11-05 Well Mode changed to Pumping
1974-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-07 Perforation Treatment Performed - Cement Squeeze
1974-09-08 Perforation Treatment Performed - Cement Squeeze
1974-09-25 Perforation Treatment Performed - Jet Perforation
1974-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-24 Perforation Treatment Performed - Jet Perforation
1979-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-27 Perforation Treatment Performed - Cement Squeeze
1979-09-29 Perforation Treatment Performed - Cement Squeeze
1979-10-17 Perforation Treatment Performed - Jet Perforation
1979-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-02 Perforation Treatment Performed - Fractured
1985-10-02 Perforation Treatment Performed - Jet Perforation
1985-10-02 Well Log Performed
1985-10-11 Perforation Treatment Performed - Jet Perforation
1985-10-11 Well Log Performed
1997-09-19 Well Log Performed
1997-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-12-29 Open Hole/Barefoot Completion 2525.30 2575.30 13
1959-01-31 Acid Treatment 2480.50 2523.70 7
1970-10-30 Perforation 2473.10 2475.00 7
1970-10-30 Perforation 2478.60 2479.90 7
1970-10-31 Acid Treatment 2473.10 2479.90 0
1974-03-23 Acid Treatment 2514.60 2523.70 0
1974-03-24 Acid Treatment 2473.10 2495.70 0
1974-09-07 Cement Squeeze 2498.10 2512.20 0
1974-09-08 Cement Squeeze 2498.10 2512.20 0
1974-09-25 Perforation 2473.10 2474.40 3
1974-09-25 Perforation 2475.90 2477.10 3
1959-01-22 Bullet Perforation 2319.20 2319.50 13
1974-09-25 Perforation 2478.90 2480.20 3
1974-09-25 Perforation 2482.90 2489.00 3
1974-09-26 Acid Treatment 2473.10 2489.00 0
1974-09-30 Acid Treatment 2473.10 2489.00 0
1975-11-25 Acid Treatment 2473.10 2489.00 0
1976-02-26 Acid Treatment 2473.10 2489.00 0
1976-02-27 Acid Treatment 2473.10 2489.00 0
1976-04-01 Acid Treatment 2473.10 2489.00 0
1976-04-01 Acid Treatment 2473.10 2489.00 0
1979-09-24 Perforation 2480.50 2482.30 14
1959-01-22 Bullet Perforation 2471.60 2471.90 13
1979-09-24 Perforation 2489.00 2490.80 14
1979-09-25 Acid Treatment 2471.00 2490.80 0
1979-09-27 Cement Squeeze 2471.00 2490.80 0
1979-09-29 Cement Squeeze 2471.00 2490.80 0
1979-10-17 Perforation 2473.10 2474.40 7
1979-10-17 Perforation 2475.90 2477.10 7
1979-10-17 Perforation 2478.60 2480.20 7
1979-10-18 Acid Treatment 2473.10 2480.20 0
1985-10-02 Perforation 2522.40 2523.90 7
1985-10-02 Perforation 2520.00 2521.20 7
1959-01-23 Cement Squeeze 2319.20 2471.90 7
1985-10-02 Perforation 2516.30 2518.70 7
1985-10-02 Perforation 2494.80 2495.70 7
1985-10-02 Perforation 2492.40 2493.60 7
1985-10-02 Perforation 2488.70 2489.30 7
1985-10-02 Fracture 2536.50 2540.10 0
1985-10-02 Fracture 2531.40 2535.00 0
1985-10-11 Perforation 2503.00 2505.50 7
1997-09-26 Acid Treatment 2473.10 2493.60 0
1997-10-01 Acid Treatment 2525.30 2540.10 0
1959-01-25 Perforation 1523.10 1523.40 7
1959-01-25 Cement Squeeze 1523.10 1523.40 7
1959-01-31 Perforation 2480.50 2495.70 7
1959-01-31 Perforation 2498.10 2512.20 7
1959-01-31 Perforation 2514.60 2523.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5450 0.0 0.0 0.0
1968 6990 0.0 0.0 0.0
1969 3267 0.0 0.0 0.0
1970 3461 0.0 0.0 0.0
1971 6632 0.0 0.0 0.0
1972 7360 0.0 0.0 0.0
1973 4790 0.0 0.0 0.0
1974 2491 0.0 0.0 0.0
1975 6449 0.0 0.0 0.0
1976 1840 0.0 0.0 0.0
1980 2536 0.0 0.0 0.0
1985 1520 0.0 0.0 0.0
1986 8454 0.0 0.0 0.0
1987 7779 0.0 0.0 0.0
1988 8203 0.0 0.0 0.0
1989 4376 0.0 0.0 0.0
1990 3239 0.0 0.0 0.0
1991 7 0.0 0.0 0.0
1993 7700 0.0 0.0 0.0
1994 8555 0.0 0.0 0.0
1995 8743 0.0 0.0 0.0
1996 8511 0.0 0.0 0.0
1997 4419 0.0 0.0 0.0
1998 8539 0.0 0.0 0.0
1999 8561 0.0 0.0 0.0
2000 8526 0.0 0.0 0.0
2001 8676 0.0 0.0 0.0
2002 8567 0.0 0.0 0.0
2003 8589 0.0 0.0 0.0
2004 8537 0.0 0.0 0.0
2005 8624 0.0 0.0 0.0
2006 8571 0.0 0.0 0.0
2007 7826 0.0 0.0 0.0
2008 8277 0.0 0.0 0.0
2009 8523 0.0 0.0 0.0
2010 8639 0.0 0.0 0.0
2011 4502 0.0 0.0 0.0
2012 8109 0.0 0.0 0.0
2013 8368 0.0 0.0 0.0
2014 8328 0.0 0.0 0.0
2015 8552 0.0 0.0 0.0
2016 8383 0.0 0.0 0.0
2017 8260 0.0 0.0 0.0
2018 8667 0.0 0.0 0.0
2019 7886 0.0 0.0 0.0
2020 2067 0.0 0.0 0.0

For data sources see[5]

References