Well Details

Well ID: 0675102112000
Loading map...
Location: 00/12-21-067-10W5/0
Location Alias: 00/12-21-67-10 W5M
Location Alias 2: 00/12-21-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 21
County/Municipality: Big Lakes County
Well Name: CNRL ET AL SWANH 12-21-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0017659
License Date: 1959-08-28
License Status: Issued
Spud Date: 1959-09-09
Final Drill Date: 1959-10-07
Well Total Depth: 2492.00 m
Surface Hole Latitude: 54.816103
Surface Hole Longitude: -115.473287

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-08-28 Obtained License
1959-10-07 Finished Drilling
1959-10-07 Well Mode changed to Drilled and Cased
1959-10-09 Production Casing Operation Performed
1959-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-10-12 Perforation Treatment Performed - Jet Perforation
1959-10-18 Well Began Production
1959-10-18 Well Fluid changed to Crude Oil
1959-10-18 Well Mode changed to Flowing
1971-08-24 Perforation Treatment Performed - Jet Perforation
1971-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-06-14 Well Fluid changed to Crude Oil
1973-06-14 Well Mode changed to Pumping
1979-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-25 Perforation Treatment Performed - Cement Squeeze
1979-03-30 Perforation Treatment Performed - Jet Perforation
1979-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-04-03 Perforation Treatment Performed - Jet Perforation
1979-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-01 Perforation Treatment Performed - Chemical Squeeze
1979-06-10 Perforation Treatment Performed - Jet Perforation
1979-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-24 Perforation Treatment Performed - Jet Perforation
1984-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-21 Perforation Treatment Performed - Jet Perforation
1985-07-21 Well Log Performed
1985-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-10 Well Began Injection
1985-10-10 Well Fluid changed to Solvent
1985-10-10 Well Type changed to Injection
1985-10-15 Well Log Performed
1985-11-28 Well Log Performed
1986-06-26 Well Log Performed
2005-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-10-12 Perforation 2423.80 2429.90 7
1971-08-24 Perforation 2411.00 2411.60 7
1971-08-24 Perforation 2433.80 2434.70 7
1971-08-25 Acid Treatment 2433.80 2434.70 0
1971-08-25 Acid Treatment 2388.40 2411.60 0
1971-09-01 Packing Device Capped w/Cement 2432.30 2432.30 0
1979-03-23 Acid Treatment 2388.40 2434.70 0
1979-03-25 Cement Squeeze 2388.40 2434.70 0
1979-03-30 Perforation 2393.30 2394.20 13
1979-03-30 Perforation 2398.80 2401.50 13
1979-03-30 Perforation 2406.40 2409.10 13
1959-10-12 Acid Treatment 2423.80 2429.90 0
1979-03-30 Perforation 2410.40 2411.00 13
1979-03-31 Acid Treatment 2393.30 2411.00 0
1979-04-03 Perforation 2398.80 2401.50 13
1979-04-03 Perforation 2406.40 2409.10 13
1979-04-03 Perforation 2410.40 2411.00 13
1979-04-07 Acid Treatment 2393.30 2411.00 0
1979-05-01 Chemical Squeeze 2393.30 2411.00 0
1979-06-10 Perforation 2423.50 2425.90 9
1979-06-10 Perforation 2427.40 2429.60 9
1979-06-11 Acid Treatment 2393.30 2429.60 0
1971-08-24 Perforation 2388.40 2389.00 7
1984-03-24 Perforation 2433.50 2436.50 13
1984-03-24 Perforation 2437.50 2438.00 13
1984-03-24 Perforation 2444.50 2445.70 13
1984-03-24 Perforation 2450.50 2452.00 13
1984-03-24 Perforation 2458.50 2460.50 13
1984-03-27 Acid Treatment 2393.30 2460.50 0
1985-07-21 Perforation 2384.20 2386.00 7
1985-07-21 Perforation 2389.00 2390.90 7
1985-07-21 Perforation 2393.90 2395.10 7
1985-07-21 Perforation 2415.50 2417.00 7
1971-08-24 Perforation 2389.30 2390.90 7
1985-07-23 Acid Treatment 2384.20 2460.50 0
2005-03-11 Acid Treatment 2384.20 2460.50 0
1971-08-24 Perforation 2392.40 2392.70 7
1971-08-24 Perforation 2394.20 2395.10 7
1971-08-24 Perforation 2400.60 2402.10 7
1971-08-24 Perforation 2406.10 2408.50 7
1971-08-24 Perforation 2409.10 2409.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1971 1766 0.0 0.0 0.0
1972 8175 0.0 0.0 0.0
1973 8620 0.0 0.0 0.0
1974 7868 0.0 0.0 0.0
1975 8323 0.0 0.0 0.0
1976 943 0.0 0.0 0.0
1977 3668 0.0 0.0 0.0
1978 7306 0.0 0.0 0.0
1979 5643 0.0 0.0 0.0
1980 8256 0.0 0.0 0.0
1981 4334 0.0 0.0 0.0
1982 7205 0.0 0.0 0.0
1983 6496 0.0 0.0 0.0
1984 7829 0.0 0.0 0.0
1985 5062 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References