X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675101810000

Well Details

Well ID: 0675101810000
Loading map...
Location: 00/10-18-067-10W5/0
Location Alias: 00/10-18-67-10 W5M
Location Alias 2: 00/10-18-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 18
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 10-18-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0016097
License Date: 1958-10-24
License Status: Abandoned
Spud Date: 1958-11-01
Final Drill Date: 1958-12-09
Well Total Depth: 2532.00 m
Surface Hole Latitude: 54.801919
Surface Hole Longitude: -115.510868

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-10-24 Obtained License
1958-12-09 Finished Drilling
1958-12-09 Well Mode changed to Drilled and Cased
1958-12-10 Well Log Performed
1958-12-21 Production Casing Operation Performed
1959-01-25 Perforation Treatment Performed - Jet Perforation
1959-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-01-28 Well Began Production
1959-01-28 Well Fluid changed to Crude Oil
1959-01-28 Well Mode changed to Flowing
1959-03-08 Perforation Treatment Performed - Jet Perforation
1959-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-03-15 Perforation Treatment Performed - Nitrogen Treatment
1963-08-25 Well Began Injection
1963-08-25 Well Fluid changed to Water
1963-08-25 Well Type changed to Injection
1973-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-01 Well Fluid changed to Water
1983-01-01 Well Mode changed to Suspended
1983-01-01 Well Type changed to Injection
1990-08-27 Well Log Performed
1990-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-30 Plug Back Performed
1990-08-30 Well Fluid changed to Water
1990-08-30 Well Mode changed to Abandoned Zone
1990-08-30 Well Type changed to Injection
1990-08-31 Well Log Performed
2001-04-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-01-25 Perforation 2431.10 2444.20 7
1959-03-15 Acid Treatment 2425.00 2430.80 0
1959-03-15 Nitrogen Treatment 2425.00 2430.80 0
1973-03-29 Acid Treatment 2500.60 2519.80 0
1973-03-29 Acid Treatment 2463.40 2495.10 0
1973-03-29 Acid Treatment 2425.00 2459.70 0
1977-08-08 Acid Treatment 2425.00 2519.80 0
1977-12-07 Acid Treatment 2431.10 2519.80 0
1978-01-21 Acid Treatment 2425.00 2519.80 0
1978-02-12 Acid Treatment 2425.00 2519.80 0
1978-02-19 Acid Treatment 2425.00 2519.80 0
1959-01-25 Perforation 2444.50 2459.70 7
1978-03-16 Acid Treatment 2425.00 2519.80 0
1978-03-31 Acid Treatment 2425.00 2519.80 0
1978-04-30 Acid Treatment 2425.00 2519.80 0
1978-05-14 Acid Treatment 2425.00 2519.80 0
1978-06-04 Acid Treatment 2425.00 2519.80 0
1978-06-25 Acid Treatment 2425.00 2519.80 0
1990-08-30 Packing Device Capped w/Cement 2368.00 2385.00 0
1959-01-25 Perforation 2463.40 2476.80 7
1959-01-25 Perforation 2481.70 2495.10 7
1959-01-25 Perforation 2500.60 2502.70 7
1959-01-25 Perforation 2507.00 2511.90 7
1959-01-25 Perforation 2516.70 2519.80 7
1959-01-26 Acid Treatment 2431.10 2519.80 0
1959-03-08 Perforation 2425.00 2430.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0

For data sources see[5]

References