X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675101804000

Well Details

Well ID: 0675101804000
Loading map...
Location: 00/04-18-067-10W5/0
Location Alias: 00/04-18-67-10 W5M
Location Alias 2: 00/04-18-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 18
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 4-18-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0016700
License Date: 1959-02-10
License Status: Suspension
Spud Date: 1959-02-20
Final Drill Date: 1959-03-22
Well Total Depth: 2591.70 m
Surface Hole Latitude: 54.794242
Surface Hole Longitude: -115.522842

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-02-10 Obtained License
1959-03-22 Finished Drilling
1959-03-22 Well Mode changed to Drilled and Cased
1959-03-25 Production Casing Operation Performed
1959-03-27 Perforation Treatment Performed - Open-Hole Completion
1959-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-03-31 Well Began Production
1959-03-31 Well Fluid changed to Crude Oil
1959-03-31 Well Mode changed to Flowing
1961-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-12 Perforation Treatment Performed - Jet Perforation
1964-11-22 Well Fluid changed to Crude Oil
1964-11-22 Well Mode changed to Pumping
1966-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-03-05 Perforation Treatment Performed - Bullet Perforation
1980-10-01 Well Fluid changed to Crude Oil
1980-10-01 Well Mode changed to Suspended
1998-06-13 Perforation Treatment Performed - Jet Perforation
1998-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-06-17 Well Log Performed
2016-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-06-18 Plug Back Performed
2016-06-18 Well Fluid changed to Crude Oil
2016-06-18 Well Log Performed
2016-06-18 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-03-27 Open Hole/Barefoot Completion 2577.40 2591.70 0
1998-06-16 Acid Treatment 2462.80 2485.90 0
2016-06-18 Packing Device Capped w/Cement 2519.00 2527.00 0
2016-06-18 Packing Device Capped w/Cement 2461.00 2469.00 0
1959-03-29 Acid Treatment 2577.40 2591.70 0
1961-02-12 Perforation 2544.80 2555.70 7
1961-02-12 Perforation 2539.60 2544.20 7
1961-02-12 Acid Treatment 2539.60 2591.70 0
1966-03-03 Packing Device Capped w/Cement 2574.60 2574.60 0
1966-03-05 Bullet Perforation 2564.60 2566.40 7
1966-03-05 Bullet Perforation 2569.80 2572.20 7
1998-06-13 Perforation 2480.40 2481.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1980 4537 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-06-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References