X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675100402000

Well Details

Well ID: 0675100402000
Loading map...
Location: 00/02-04-067-10W5/0
Location Alias: 00/02-04-67-10 W5M
Location Alias 2: 00/02-04-067-10 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 10
Section: 04
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 2-4-67-10
Operator Name: Canadian Natural Resources Limited
License Number: 0018599
License Date: 1960-01-29
License Status: Suspension
Spud Date: 1960-02-16
Final Drill Date: 1960-03-11
Well Total Depth: 2734.70 m
Surface Hole Latitude: 54.765400
Surface Hole Longitude: -115.459981

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-01-29 Obtained License
1960-03-11 Finished Drilling
1960-03-11 Well Mode changed to Drilled and Cased
1960-03-12 Production Casing Operation Performed
1960-03-15 Perforation Treatment Performed - Jet Perforation
1960-03-26 Well Began Production
1960-03-26 Well Fluid changed to Crude Oil
1960-03-26 Well Mode changed to Flowing
1972-10-29 Perforation Treatment Performed - Jet Perforation
1972-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-21 Well Fluid changed to Crude Oil
1973-06-21 Well Mode changed to Pumping
1974-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-22 Perforation Treatment Performed - Cement Squeeze
1977-10-05 Perforation Treatment Performed - Jet Perforation
1977-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-07 Well Log Performed
1987-12-08 Perforation Treatment Performed - Jet Perforation
1987-12-08 Well Log Performed
1987-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-21 Well Began Injection
1987-12-21 Well Fluid changed to Water
1987-12-21 Well Type changed to Injection
1988-02-15 Well Log Performed
1988-02-17 Well Log Performed
1988-02-18 Well Log Performed
1988-02-23 Well Log Performed
1988-08-02 Well Fluid changed to Solvent
1988-08-02 Well Type changed to Injection
1988-10-17 Well Log Performed
1993-07-15 Well Log Performed
1993-10-05 Well Log Performed
1997-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-10-02 Well Log Performed
2007-11-16 Well Fluid changed to Crude Oil
2007-11-16 Well Mode changed to Pumping
2012-12-01 Well Fluid changed to Crude Oil
2012-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-03-15 Perforation 2639.60 2645.70 7
1972-10-29 Perforation 2662.70 2669.10 7
1972-10-29 Perforation 2658.50 2662.70 7
1972-10-29 Perforation 2656.90 2657.60 7
1972-10-29 Perforation 2654.20 2654.80 7
1972-10-29 Perforation 2652.10 2653.30 7
1972-10-29 Perforation 2647.20 2651.20 7
1972-10-29 Perforation 2672.20 2672.80 7
1972-11-01 Acid Treatment 2675.20 2684.70 0
1972-11-01 Acid Treatment 2670.40 2685.30 0
1972-11-01 Acid Treatment 2627.40 2670.40 0
1960-03-15 Perforation 2639.60 2645.70 0
1974-08-17 Acid Treatment 2639.60 2701.10 0
1977-09-22 Cement Squeeze 2639.60 2656.30 0
1977-10-05 Perforation 2657.90 2669.70 7
1977-10-06 Acid Treatment 2657.90 2669.70 0
1987-12-08 Perforation 2688.00 2689.90 13
1987-12-08 Perforation 2671.60 2683.60 13
1987-12-08 Perforation 2640.20 2655.10 7
1987-12-08 Perforation 2622.20 2639.10 7
1987-12-08 Perforation 2614.60 2620.70 7
1987-12-11 Acid Treatment 2688.00 2701.00 0
1972-10-29 Perforation 2700.50 2701.10 7
1987-12-11 Acid Treatment 2671.60 2683.60 0
1987-12-11 Acid Treatment 2657.90 2669.70 0
1987-12-12 Acid Treatment 2614.60 2655.10 0
1997-07-22 Acid Treatment 2614.60 2701.00 0
2002-05-16 Acid Treatment 2614.60 2701.00 0
1972-10-29 Perforation 2698.70 2699.90 7
1972-10-29 Perforation 2695.00 2696.00 7
1972-10-29 Perforation 2690.80 2692.30 7
1972-10-29 Perforation 2688.00 2689.30 7
1972-10-29 Perforation 2678.60 2682.80 7
1972-10-29 Perforation 2674.90 2676.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1972 145 0.0 0.0 0.0
1973 7870 0.0 0.0 0.0
1974 6264 0.0 0.0 0.0
1975 6673 0.0 0.0 0.0
1976 884 0.0 0.0 0.0
1977 1572 0.0 0.0 0.0
1978 7675 0.0 0.0 0.0
1979 8132 0.0 0.0 0.0
1980 8682 0.0 0.0 0.0
1981 6821 0.0 0.0 0.0
1982 8306 0.0 0.0 0.0
1983 8466 0.0 0.0 0.0
1984 8063 0.0 0.0 0.0
1985 8419 0.0 0.0 0.0
1986 8351 0.0 0.0 0.0
1987 7540 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 958 0.0 0.0 0.0
2008 7904 0.0 0.0 0.0
2009 7949 0.0 0.0 0.0
2010 480 0.0 0.0 0.0
2012 24 0.0 0.0 0.0

For data sources see[5]

References