X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675093002000

Well Details

Well ID: 0675093002000
Loading map...
Location: 00/02-30-067-09W5/0
Location Alias: 00/02-30-67-09 W5M
Location Alias 2: 00/02-30-067-09 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 09
Section: 30
County/Municipality: Big Lakes County
Well Name: 1976082 SWANH 2-30-67-9
Operator Name: Razor Energy Corp.
License Number: 0035582
License Date: 1969-01-07
License Status: Suspension
Spud Date: 1969-01-17
Final Drill Date: 1969-02-11
Well Total Depth: 2389.60 m
Surface Hole Latitude: 54.825077
Surface Hole Longitude: -115.355325

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-01-07 Obtained License
1969-02-11 Finished Drilling
1969-02-11 Well Mode changed to Drilled and Cased
1969-02-12 Production Casing Operation Performed
1969-02-27 Perforation Treatment Performed - Jet Perforation
1969-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-08 Well Began Production
1969-03-08 Well Fluid changed to Crude Oil
1969-03-08 Well Mode changed to Pumping
1971-04-22 Well Began Injection
1971-04-22 Well Fluid changed to Water
1971-04-22 Well Type changed to Injection
1993-06-06 Well Log Performed
1993-06-24 Perforation Treatment Performed - Cement Squeeze
1993-06-28 Perforation Treatment Performed - Jet Perforation
1993-06-28 Well Log Performed
1996-03-21 Well Fluid changed to Water
1996-03-21 Well Mode changed to Closed
1996-03-21 Well Type changed to Injection
1996-10-21 Well Fluid changed to Water
1996-10-21 Well Type changed to Injection
1997-07-31 Well Fluid changed to Water
1997-07-31 Well Mode changed to Suspended
1997-07-31 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-02-27 Perforation 2345.10 2351.80 3
1969-02-27 Perforation 2352.80 2356.40 3
1969-02-27 Perforation 2361.90 2363.40 3
1969-02-27 Perforation 2366.50 2367.40 7
1969-02-27 Perforation 2368.90 2369.80 7
1969-03-02 Acid Treatment 2345.10 2369.80 0
1993-06-24 Cement Squeeze 2345.10 2356.40 0
1993-06-28 Perforation 2341.20 2351.50 13
1993-06-28 Perforation 2362.20 2372.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 5465 0.0 0.0 0.0
1970 8408 0.0 0.0 0.0
1971 1416 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0

For data sources see[5]

References