If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0675083314020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.842297,"lon":-115.141931,"icon":""}]} |
| Location: 02/14-33-067-08W5/0 | |
| Location Alias: 02/14-33-67-08 W5M | |
| Location Alias 2: 02/14-33-067-08 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 067 | |
| Meridian: 5 | |
| Range: 08 | |
| Section: 33 | |
| County/Municipality: Big Lakes County | |
| Well Name: ASPENLEAF 5-34 HZ SWANH 14-33-67-8 | |
| Operator Name: Aspenleaf Energy Limited | |
| License Number: 0436596 | |
| License Date: 2011-09-07 | |
| License Status: Issued | |
| Spud Date: 2011-10-19 | |
| Final Drill Date: 2011-11-04 | |
| Well Total Depth: 3602.00 m | |
| Surface Hole Latitude: 54.842297 | |
| Surface Hole Longitude: -115.141931 |
| Date | Event |
|---|---|
| 2011-09-07 | Obtained License |
| 2011-10-21 | Surface Casing Operation Performed |
| 2011-10-24 | Well Log Performed |
| 2011-10-25 | Direction Drilling Operation Performed - Horizontal |
| 2011-10-27 | Well Log Performed |
| 2011-10-28 | Intermediate Casing Operation Performed |
| 2011-11-04 | Finished Drilling |
| 2011-11-04 | Well Log Performed |
| 2011-11-04 | Well Mode changed to Drilled and Cased |
| 2011-11-07 | Liner Casing Operation Performed |
| 2011-11-07 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-11-07 | Rig Released |
| 2011-11-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-12-20 | Well Began Production |
| 2011-12-20 | Well Fluid changed to Crude Oil |
| 2011-12-20 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-10-25 | 2008.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-11-07 | Open Hole/Barefoot Completion | 3596.00 | 3602.00 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 2874.40 | 2875.20 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 2926.80 | 2927.90 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 2978.70 | 2979.50 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 3041.60 | 3042.70 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 3093.10 | 3093.90 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 3145.20 | 3146.40 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 3197.00 | 3197.80 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 3249.00 | 3250.10 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 3301.20 | 3302.00 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 3353.10 | 3354.30 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 2440.00 | 2440.70 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 3415.50 | 3416.30 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 3467.40 | 3468.60 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 3519.20 | 3520.00 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 3575.40 | 3576.70 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 2500.90 | 2501.70 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 2551.40 | 2552.20 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 2601.60 | 2602.40 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 2662.60 | 2663.40 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 2713.00 | 2713.80 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 2763.10 | 2763.90 | 0 |
| 2011-11-20 | Multi-Stage Fracture | 2824.00 | 2824.80 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 72 | 0.0 | 0.0 | 0.0 |
| 2012 | 7798 | 0.0 | 0.0 | 0.0 |
| 2013 | 7306 | 0.0 | 0.0 | 0.0 |
| 2014 | 8021 | 0.0 | 0.0 | 0.0 |
| 2015 | 8191 | 0.0 | 0.0 | 0.0 |
| 2016 | 6902 | 0.0 | 0.0 | 0.0 |
| 2017 | 7757 | 0.0 | 0.0 | 0.0 |
| 2018 | 7080 | 0.0 | 0.0 | 0.0 |
| 2019 | 8260 | 0.0 | 0.0 | 0.0 |
| 2020 | 594 | 0.0 | 0.0 | 0.0 |
For data sources see[6]