X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675081702020

Well Details

Well ID: 0675081702020
Loading map...
Location: 02/02-17-067-08W5/0
Location Alias: 02/02-17-67-08 W5M
Location Alias 2: 02/02-17-067-08 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 08
Section: 17
County/Municipality: Big Lakes County
Well Name: ASPENLEAF 4-9 HZ SWANH 2-17-67-8
Operator Name: Aspenleaf Energy Limited
License Number: 0432612
License Date: 2011-03-28
License Status: Suspension
Spud Date: 2011-06-11
Final Drill Date: 2011-06-26
Well Total Depth: 4010.00 m
Surface Hole Latitude: 54.779611
Surface Hole Longitude: -115.167762

For data sources see[1][2]

Well History

Date Event
2011-03-28 Obtained License
2011-06-12 Surface Casing Operation Performed
2011-06-16 Well Log Performed
2011-06-17 Direction Drilling Operation Performed - Horizontal
2011-06-19 Well Log Performed
2011-06-20 Intermediate Casing Operation Performed
2011-06-26 Finished Drilling
2011-06-26 Well Log Performed
2011-06-26 Well Mode changed to Drilled and Cased
2011-06-27 Well Log Performed
2011-06-28 Rig Released
2011-08-11 Liner Casing Operation Performed
2011-08-11 Perforation Treatment Performed - Open-Hole Completion
2011-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-04 Well Began Production
2011-09-04 Well Fluid changed to Crude Oil
2011-09-04 Well Mode changed to Pumping
2011-09-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-11 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-31 Well Fluid changed to Crude Oil
2016-08-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-06-17 2096.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-11 Open Hole/Barefoot Completion 3886.40 4010.00 0
2011-09-11 Multi-Stage Fracture 2767.80 2767.90 0
2011-09-11 Multi-Stage Fracture 2667.40 2667.60 0
2011-09-11 Multi-Stage Fracture 2567.50 2567.70 0
2011-09-04 Multi-Stage Fracture 3866.00 3866.20 0
2011-09-04 Multi-Stage Fracture 3757.30 3757.50 0
2011-09-04 Multi-Stage Fracture 3659.00 3659.20 0
2011-09-04 Multi-Stage Fracture 3366.70 3366.80 0
2011-09-04 Multi-Stage Fracture 3161.80 3162.00 0
2011-09-10 Multi-Stage Fracture 3064.40 3064.60 0
2011-09-10 Multi-Stage Fracture 2967.80 2968.00 0
2011-09-11 Multi-Stage Fracture 2867.60 2867.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2516 0.0 0.0 0.0
2014 652 0.0 0.0 0.0

For data sources see[6]

References