X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675020614000

Well Details

Well ID: 0675020614000
Loading map...
Location: 00/14-06-067-02W5/0
Location Alias: 00/14-06-67-02 W5M
Location Alias 2: 00/14-06-067-02 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 02
Section: 06
County/Municipality: Woodlands County
Well Name: CNRES BIG BEND 14-6-67-2
Operator Name: Canadian Natural Resources Limited
License Number: 0213760
License Date: 1998-02-23
License Status: Suspension
Spud Date: 1998-02-27
Final Drill Date: 1998-03-03
Well Total Depth: 809.00 m
Surface Hole Latitude: 54.776339
Surface Hole Longitude: -114.294742

For data sources see[1][2]

Well History

Date Event
1998-02-23 Obtained License
1998-02-28 Surface Casing Operation Performed
1998-03-03 Finished Drilling
1998-03-03 Production Casing Operation Performed
1998-03-03 Well Log Performed
1998-03-03 Well Mode changed to Drilled and Cased
1998-03-04 Rig Released
1998-03-05 Well Began Production
1998-03-05 Well Fluid changed to Gas
1998-03-05 Well Log Performed
1998-03-05 Well Mode changed to Flowing
1998-03-06 Perforation Treatment Performed - Jet Perforation
1998-03-06 Well Log Performed
2004-03-04 Perforation Treatment Performed - Cement Squeeze
2004-03-04 Plug Back Performed
2004-03-06 Perforation Treatment Performed - Jet Perforation
2004-03-06 Well Log Performed
2004-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-08 Plug Back Performed
2004-03-08 Well Fluid changed to Gas
2004-03-08 Well Log Performed
2004-03-08 Well Mode changed to Abandoned Zone
2004-03-09 Perforation Treatment Performed - Jet Perforation
2004-03-09 Well Log Performed
2006-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-27 Plug Back Performed
2006-02-28 Perforation Treatment Performed - Jet Perforation
2006-02-28 Well Log Performed
2006-03-01 Perforation Treatment Performed - Jet Perforation
2006-03-01 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2006-03-01 Plug Back Performed
2006-03-01 Well Log Performed
2006-03-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-06 Perforation 764.50 765.80 13
2006-02-28 Perforation 570.00 570.40 17
2006-03-01 Packing Dev Cpd w/Res-Gyp Cem 571.00 574.00 0
2006-03-01 Perforation 561.00 562.00 17
1998-03-06 Perforation 567.00 568.00 13
2004-03-04 Cement Squeeze 567.00 568.00 0
2004-03-06 Perforation 760.50 760.60 2
2004-03-06 Perforation 760.00 761.00 17
2004-03-08 Packing Device Capped w/Cement 745.00 753.00 0
2004-03-09 Perforation 575.00 575.50 17
2004-03-09 Perforation 636.00 637.00 17
2006-02-27 Packing Device Capped w/Cement 622.00 630.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 5940 0.0 0.0 0.0
1999 7892 0.0 0.0 0.0
2000 7073 0.0 0.0 0.0
2001 6351 0.0 0.0 0.0
2002 8565 0.0 0.0 0.0
2003 8282 0.0 0.0 0.0
2004 1440 0.0 0.0 0.0

For data sources see[5]

References