X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674262206003

Well Details

Well ID: 0674262206003
Loading map...
Location: 00/06-22-067-26W4/3
Location Alias: 00/06-22-67-26 W4M
Location Alias 2: 00/06-22-067-26 W4/03
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 26
Section: 22
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: AMOCO BIG BEND 6-22-67-26
Operator Name: BP Canada Energy Group ULC
License Number: 0052921
License Date: 1975-02-14
License Status: RecCertified
Spud Date: 1975-02-17
Final Drill Date: 1975-02-20
Well Total Depth: 865.30 m
Surface Hole Latitude: 54.809950
Surface Hole Longitude: -113.886920

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-02-14 Obtained License
1975-02-20 Finished Drilling
1975-02-20 Lost Circulation Occurred
1975-02-20 Well Mode changed to Drilled and Cased
1975-02-21 Drill Stem Test Performed
1975-02-22 Drill Stem Test Performed
1975-02-24 Production Casing Operation Performed
1975-03-07 Perforation Treatment Performed - Jet Perforation
1975-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-09 Perforation Treatment Performed - Jet Perforation
1986-07-22 Perforation Treatment Performed - Cement Squeeze
1986-07-22 Plug Back Performed
1986-07-23 Perforation Treatment Performed - Jet Perforation
1986-07-24 Perforation Treatment Performed - Jet Perforation
1986-09-01 Well Began Production
1986-09-01 Well Fluid changed to Gas
1986-09-01 Well Mode changed to Flowing
2000-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-26 Plug Back Performed
2000-06-26 Well Fluid changed to Gas
2000-06-26 Well Mode changed to Abandoned Zone
2000-07-07 Well Abandoned
2000-07-07 Well Fluid changed to Gas
2000-07-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-03-07 Perforation 849.20 850.40 7
1975-03-08 Acid Treatment 849.20 850.40 0
1975-03-09 Perforation 596.50 598.30 7
1986-07-22 Cement Squeeze 596.50 598.30 0
1986-07-23 Perforation 608.60 609.60 7
1986-07-24 Perforation 605.00 606.20 7
2000-06-26 Packing Device Capped w/Cement 807.10 822.10 0
2000-06-26 Packing Device Capped w/Cement 581.80 589.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 2727 0.0 0.0 0.0
1987 6552 0.0 0.0 0.0
1988 7083 0.0 0.0 0.0
1989 7222 0.0 0.0 0.0
1990 7913 0.0 0.0 0.0
1991 6547 0.0 0.0 0.0
1992 6562 0.0 0.0 0.0
1993 8310 0.0 0.0 0.0
1994 6993 0.0 0.0 0.0
1995 6308 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-02-20 Lost Circulation 865.30 865.30

For data sources see[6]

References