X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674222806002

Well Details

Well ID: 0674222806002
Loading map...
Location: 00/06-28-067-22W4/2
Location Alias: 00/06-28-67-22 W4M
Location Alias 2: 00/06-28-067-22 W4/02
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 22
Section: 28
County/Municipality: Athabasca County
Well Name: CNRL BAPTISTE 6-28-67-22
Operator Name: Canadian Natural Resources Limited
License Number: 0027762
License Date: 1965-02-15
License Status: Abandoned
Spud Date: 1965-03-02
Final Drill Date: 1965-03-10
Well Total Depth: 624.80 m
Surface Hole Latitude: 54.825804
Surface Hole Longitude: -113.300984

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-02-15 Obtained License
1965-03-06 Drill Stem Test Performed
1965-03-07 Blow Occurred
1965-03-10 Finished Drilling
1965-03-10 Well Mode changed to Drilled and Cased
1965-03-12 Production Casing Operation Performed
1965-03-19 Perforation Treatment Performed - Jet Perforation
1989-06-29 Perforation Treatment Performed - Cement Squeeze
1989-06-30 Perforation Treatment Performed - Jet Perforation
1990-09-17 Well Log Performed
1990-09-18 Perforation Treatment Performed - Jet Perforation
1990-09-18 Well Log Performed
1990-10-01 Well Began Production
1990-10-01 Well Fluid changed to Gas
1990-10-01 Well Mode changed to Flowing
1994-08-05 Well Log Performed
1994-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-05 Perforation Treatment Performed - Jet Perforation
1994-10-05 Plug Back Performed
1994-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-06 Plug Back Performed
1994-10-06 Well Fluid changed to Gas
1994-10-06 Well Log Performed
1994-10-06 Well Mode changed to Abandoned Zone
1994-10-17 Perforation Treatment Performed - Jet Perforation
1994-10-17 Well Log Performed
1994-10-18 Perforation Treatment Performed - Remedial Casing
1994-11-17 Well Abandoned
1994-11-17 Well Fluid changed to Gas
1994-11-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-19 Perforation 580.30 585.20 7
1994-10-18 Remedial Casing Cementing 214.00 215.00 0
1989-06-29 Cement Squeeze 580.30 585.20 0
1989-06-30 Perforation 574.00 578.00 7
1990-09-18 Perforation 415.70 418.20 20
1994-10-05 Packing Device Capped w/Cement 557.00 565.00 0
1994-10-05 Perforation 463.30 465.10 13
1994-10-06 Packing Device Capped w/Cement 451.00 459.00 0
1994-10-06 Packing Device Capped w/Cement 406.00 414.00 0
1994-10-17 Perforation 214.00 215.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 1906 0.0 0.0 0.0
1991 6106 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-03-07 Blow 578.20 578.20

For data sources see[6]

References