X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674050201050

Well Details

Well ID: 0674050201050
Loading map...
Location: 05/01-02-067-05W4/0
Location Alias: 05/01-02-67-05 W4M
Location Alias 2: 05/01-02-067-05 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 05
Section: 02
County/Municipality: Improvement District No. 349
Well Name: CNRL 2A42 REDRILL FSHR CK 1-2-67-5
Operator Name: Canadian Natural Resources Limited
License Number: 0464414
License Date: 2014-01-28
License Status: Issued
Spud Date: 2014-02-21
Final Drill Date: 2014-03-10
Well Total Depth: 2871.00 m
Surface Hole Latitude: 54.771153
Surface Hole Longitude: -110.613267

For data sources see[1][2]

Well History

Date Event
2014-01-28 Obtained License
2014-02-21 Direction Drilling Operation Performed - Deviate
2014-02-22 Surface Casing Operation Performed
2014-02-25 Direction Drilling Operation Performed - Horizontal
2014-02-25 Well Log Performed
2014-03-01 Intermediate Casing Operation Performed
2014-03-01 Well Log Performed
2014-03-10 Finished Drilling
2014-03-10 Well Log Performed
2014-03-10 Well Mode changed to Drilled and Cased
2014-03-11 Liner Casing Operation Performed
2014-03-11 Perforation Treatment Performed - Open-Hole Completion
2014-03-11 Perforation Treatment Performed - Slotted Liner or Casing
2014-03-11 Rig Released
2014-03-11 Well Log Performed
2014-03-26 Well Log Performed
2014-10-01 Well Began Production
2014-10-01 Well Fluid changed to Crude Bitumen
2014-10-01 Well Type changed to Cyclical
2018-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-03-08 Precision Drilling Corporation 399 N/A Drill To LD
2014-02-21 Precision Drilling Corporation 399 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-21 82.00 Deviate (5 - 79 degrees)
2014-02-25 620.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-11 Slotted Liner 1175.00 2850.90 0
2014-03-11 Open Hole/Barefoot Completion 2850.90 2871.00 0
2018-05-14 Acid Treatment 1175.00 2871.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 826 0.0 0.0 0.0
2015 6224 0.0 0.0 0.0
2016 6501 0.0 0.0 0.0
2017 7904 0.0 0.0 0.0
2018 8406 0.0 0.0 0.0
2019 210 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-11 No Incident Encountered 0.00 0.00
2014-08-03 No Incident Encountered 0.00 0.00
2018-05-14 No Incident Encountered 0.00 0.00

For data sources see[8]

References