X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674041212030

Well Details

Well ID: 0674041212030
Loading map...
Location: 03/12-12-067-04W4/0
Location Alias: 03/12-12-67-04 W4M
Location Alias 2: 03/12-12-067-04 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 12
County/Municipality: Improvement District No. 349
Well Name: CNRL 20A26 PRIMROSE 12-12-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0442843
License Date: 2012-01-13
License Status: Issued
Spud Date: 2012-02-12
Final Drill Date: 2012-05-06
Well Total Depth: 2733.00 m
Surface Hole Latitude: 54.780513
Surface Hole Longitude: -110.519103

For data sources see[1][2]

Well History

Date Event
2012-01-13 Obtained License
2012-02-12 Surface Casing Operation Performed
2012-02-12 Well Mode changed to Preset
2012-04-17 Direction Drilling Operation Performed - Deviate
2012-04-18 Direction Drilling Operation Performed - Horizontal
2012-04-19 Intermediate Casing Operation Performed
2012-04-19 Well Log Performed
2012-05-06 Finished Drilling
2012-05-06 Well Mode changed to Drilled and Cased
2012-05-07 Liner Casing Operation Performed
2012-05-07 Perforation Treatment Performed - Open-Hole Completion
2012-05-07 Perforation Treatment Performed - Slotted Liner or Casing
2012-05-07 Well Log Performed
2012-05-08 Rig Released
2012-09-12 Well Log Performed
2012-09-14 Well Log Performed
2013-05-01 Well Began Production
2013-05-01 Well Fluid changed to Crude Bitumen
2013-05-01 Well Type changed to Cyclical
2015-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-07-23 Perforation Treatment Performed - Jet Perforation
2017-07-24 Perforation Treatment Performed - Jet Perforation
2017-07-25 Perforation Treatment Performed - Jet Perforation
2017-07-26 Perforation Treatment Performed - Jet Perforation
2017-07-27 Perforation Treatment Performed - Jet Perforation
2017-07-28 Perforation Treatment Performed - Jet Perforation
2017-07-29 Perforation Treatment Performed - Jet Perforation
2017-07-30 Perforation Treatment Performed - Jet Perforation
2017-07-31 Perforation Treatment Performed - Jet Perforation
2017-08-01 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-05-03 Ensign Drilling Inc. 126 2736 Resumption
2012-02-12 Ensign Drilling Inc. 126 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-04-17 189.00 Deviate (5 - 79 degrees)
2012-04-18 658.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-07 Slotted Liner 1115.00 2719.50 0
2017-07-25 Perforation 2264.60 2270.60 6
2017-07-25 Perforation 2314.90 2320.90 6
2017-07-25 Perforation 2365.20 2371.20 6
2017-07-25 Perforation 2414.70 2420.70 6
2017-07-25 Perforation 1914.60 1920.60 6
2017-07-26 Perforation 1964.50 1970.50 6
2017-07-26 Perforation 2014.50 2020.50 6
2017-07-26 Perforation 2064.80 2070.80 6
2017-07-26 Perforation 2114.80 2120.80 6
2017-07-26 Perforation 2164.40 2170.40 6
2012-05-07 Open Hole/Barefoot Completion 2719.50 2733.00 0
2017-07-27 Perforation 1802.40 1808.40 6
2017-07-27 Perforation 1852.40 1858.40 6
2017-07-28 Perforation 1702.90 1708.90 6
2017-07-28 Perforation 1752.30 1758.30 6
2017-07-29 Perforation 1591.00 1597.50 6
2017-07-29 Perforation 1654.30 1660.30 6
2017-07-30 Perforation 1383.30 1389.30 6
2017-07-30 Perforation 1432.10 1438.10 6
2017-07-30 Perforation 1480.30 1486.30 6
2017-07-30 Perforation 1528.70 1534.70 6
2015-12-04 Acid Treatment 1115.00 2733.00 0
2017-07-31 Perforation 1190.50 1196.50 6
2017-07-31 Perforation 1238.40 1244.40 6
2017-07-31 Perforation 1286.30 1292.30 6
2017-07-31 Perforation 1334.80 1340.80 6
2017-08-01 Perforation 1128.80 1134.80 6
2017-07-23 Perforation 2612.90 2618.90 6
2017-07-23 Perforation 2662.20 2668.20 6
2017-07-24 Perforation 2464.70 2470.70 6
2017-07-24 Perforation 2514.80 2520.80 6
2017-07-24 Perforation 2563.80 2569.80 6
2017-07-25 Perforation 2214.60 2220.60 6

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 4334 0.0 0.0 0.0
2014 7165 0.0 0.0 0.0
2015 7526 0.0 0.0 0.0
2016 7709 0.0 0.0 0.0
2017 8107 0.0 0.0 0.0
2018 8021 0.0 0.0 0.0
2019 8742 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-12 No Incident Encountered 0.00 0.00
2012-05-08 No Incident Encountered 0.00 0.00
2012-09-17 No Incident Encountered 0.00 0.00
2015-12-10 No Incident Encountered 0.00 0.00
2017-08-02 No Incident Encountered 0.00 0.00

For data sources see[8]

References