X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674041212020

Well Details

Well ID: 0674041212020
Loading map...
Location: 02/12-12-067-04W4/0
Location Alias: 02/12-12-67-04 W4M
Location Alias 2: 02/12-12-067-04 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 04
Section: 12
County/Municipality: Improvement District No. 349
Well Name: CNRL 19A26 PRIMROSE 12-12-67-4
Operator Name: Canadian Natural Resources Limited
License Number: 0442842
License Date: 2012-01-13
License Status: Issued
Spud Date: 2012-05-08
Final Drill Date: 2012-06-22
Well Total Depth: 2652.00 m
Surface Hole Latitude: 54.780479
Surface Hole Longitude: -110.518327

For data sources see[1][2]

Well History

Date Event
2012-01-13 Obtained License
2012-05-08 Well Mode changed to Preset
2012-05-09 Surface Casing Operation Performed
2012-05-16 Direction Drilling Operation Performed - Deviate
2012-05-16 Direction Drilling Operation Performed - Horizontal
2012-05-16 Well Log Performed
2012-05-18 Intermediate Casing Operation Performed
2012-05-22 Well Log Performed
2012-06-22 Finished Drilling
2012-06-22 Well Mode changed to Drilled and Cased
2012-06-24 Liner Casing Operation Performed
2012-06-24 Perforation Treatment Performed - Open-Hole Completion
2012-06-24 Perforation Treatment Performed - Slotted Liner or Casing
2012-06-24 Rig Released
2012-08-20 Well Log Performed
2013-05-01 Well Began Production
2013-05-01 Well Fluid changed to Crude Bitumen
2013-05-01 Well Type changed to Cyclical
2014-10-03 Perforation Treatment Performed - Jet Perforation
2014-10-04 Perforation Treatment Performed - Jet Perforation
2014-10-05 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-05-08 Ensign Drilling Inc. 126 N/A Set Surface
2012-06-19 Ensign Drilling Inc. 126 2660 Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-05-16 182.00 Deviate (5 - 79 degrees)
2012-05-16 655.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-06-24 Slotted Liner 1035.00 2639.40 0
2012-06-24 Open Hole/Barefoot Completion 2639.40 2652.00 0
2014-10-03 Perforation 1982.40 2532.80 1
2014-10-04 Perforation 1670.50 1932.30 1
2014-10-05 Perforation 1052.40 1620.50 1

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 4622 0.0 0.0 0.0
2014 7008 0.0 0.0 0.0
2015 7485 0.0 0.0 0.0
2016 6849 0.0 0.0 0.0
2017 5371 0.0 0.0 0.0
2018 4374 0.0 0.0 0.0
2019 632 0.0 0.0 0.0
2020 704 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-09 No Incident Encountered 0.00 0.00
2012-06-24 No Incident Encountered 0.00 0.00
2012-08-23 No Incident Encountered 0.00 0.00
2013-04-30 No Incident Encountered 0.00 0.00
2014-10-06 No Incident Encountered 0.00 0.00

For data sources see[8]

References