X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674030209000

Well Details

Well ID: 0674030209000
Loading map...
Location: 00/09-02-067-03W4/0
Location Alias: 00/09-02-67-03 W4M
Location Alias 2: 00/09-02-067-03 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 03
Section: 02
County/Municipality: Improvement District No. 349
Well Name: CNRL 11A75 PRIMROSE 9-2-67-3
Operator Name: Canadian Natural Resources Limited
License Number: 0381916
License Date: 2007-09-17
License Status: Issued
Spud Date: 2007-10-30
Final Drill Date: 2008-01-14
Well Total Depth: 1664.00 m
Surface Hole Latitude: 54.783232
Surface Hole Longitude: -110.334094

For data sources see[1][2]

Well History

Date Event
2007-09-17 Obtained License
2007-10-30 Surface Casing Operation Performed
2007-11-06 Well Log Performed
2007-12-10 Direction Drilling Operation Performed - Horizontal
2007-12-12 Intermediate Casing Operation Performed
2008-01-14 Finished Drilling
2008-01-14 Well Log Performed
2008-01-14 Well Mode changed to Drilled and Cased
2008-01-15 Liner Casing Operation Performed
2008-01-15 Perforation Treatment Performed - Open-Hole Completion
2008-01-15 Perforation Treatment Performed - Slotted Liner or Casing
2008-01-15 Rig Released
2008-01-15 Well Log Performed
2008-04-07 Well Log Performed
2009-10-01 Well Began Production
2009-10-01 Well Fluid changed to Crude Bitumen
2009-10-01 Well Type changed to Cyclical
2011-11-26 Well Log Performed
2018-03-31 Perforation Treatment Performed - Jet Perforation
2018-04-01 Perforation Treatment Performed - Jet Perforation
2018-04-02 Perforation Treatment Performed - Jet Perforation
2019-12-15 Well Log Performed
2020-02-14 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-12-10 200.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-15 Slotted Liner 770.00 1659.00 0
2018-04-01 Perforation 1413.60 1419.60 10
2018-04-01 Perforation 1386.80 1392.80 10
2018-04-01 Perforation 1360.60 1366.60 10
2018-04-01 Perforation 1334.50 1340.50 10
2018-04-01 Perforation 1308.10 1314.10 10
2018-04-01 Perforation 1281.50 1287.50 10
2018-04-01 Perforation 1228.90 1234.90 10
2018-04-01 Perforation 1150.30 1156.30 10
2018-04-01 Perforation 1098.30 1104.30 10
2018-04-01 Perforation 1072.50 1078.50 10
2008-01-15 Open Hole/Barefoot Completion 1659.00 1664.00 0
2018-04-02 Perforation 1046.50 1052.50 10
2018-04-02 Perforation 1020.30 1026.30 10
2018-04-02 Perforation 994.40 1000.40 10
2018-04-02 Perforation 969.00 975.00 10
2018-04-02 Perforation 943.10 949.10 10
2018-04-02 Perforation 916.50 922.50 10
2018-04-02 Perforation 890.70 896.70 10
2018-04-02 Perforation 864.20 870.20 10
2018-04-02 Perforation 838.50 844.50 10
2018-04-02 Perforation 812.80 818.80 10
2018-03-31 Perforation 1622.70 1628.70 10
2018-03-31 Perforation 1596.80 1602.80 10
2018-03-31 Perforation 1570.40 1576.40 10
2018-03-31 Perforation 1543.90 1549.90 10
2018-03-31 Perforation 1517.40 1523.40 10
2018-03-31 Perforation 1464.90 1470.90 10
2018-04-01 Perforation 1439.40 1445.40 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 525 0.0 0.0 0.0
2010 4907 0.0 0.0 0.0
2011 4996 0.0 0.0 0.0
2012 5541 0.0 0.0 0.0
2013 8650 0.0 0.0 0.0
2014 7903 0.0 0.0 0.0
2015 8104 0.0 0.0 0.0
2016 5224 0.0 0.0 0.0
2017 8119 0.0 0.0 0.0
2018 8446 0.0 0.0 0.0
2019 8351 0.0 0.0 0.0
2020 1789 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References