X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666063305000

Well Details

Well ID: 0666063305000
Loading map...
Location: 00/05-33-066-06W6/0
Location Alias: 00/05-33-66-06 W6M
Location Alias 2: 00/05-33-066-06 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 06
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: SCL HZ GOLDCK 5-33-66-6
Operator Name: Shell Canada Limited
License Number: 0447361
License Date: 2012-07-25
License Status: Issued
Spud Date: 2012-08-16
Final Drill Date: 2012-09-26
Well Total Depth: 4556.00 m
Surface Hole Latitude: 54.766374
Surface Hole Longitude: -118.872800

For data sources see[1][2]

Well History

Date Event
2012-07-25 Obtained License
2012-08-18 Surface Casing Operation Performed
2012-08-27 Direction Drilling Operation Performed - Deviate
2012-08-31 Direction Drilling Operation Performed - Horizontal
2012-09-02 Intermediate Casing Operation Performed
2012-09-03 Well Log Performed
2012-09-26 Finished Drilling
2012-09-26 Well Log Performed
2012-09-26 Well Mode changed to Drilled and Cased
2012-09-27 Liner Casing Operation Performed
2012-09-27 Well Log Performed
2012-09-28 Perforation Treatment Performed - Open-Hole Completion
2012-10-01 Rig Released
2012-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-04 Well Fluid changed to Gas
2012-11-04 Well Mode changed to Testing
2013-02-03 Well Began Production
2013-02-03 Well Fluid changed to Gas
2013-02-03 Well Mode changed to Flowing
2014-12-08 Perforation Treatment Performed - Jet Perforation
2014-12-09 Perforation Treatment Performed - Jet Perforation
2017-04-12 Well Fluid changed to Gas
2017-04-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-16 Trinidad Drilling Ltd. 76 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-27 2562.00 Deviate (5 - 79 degrees)
2012-08-31 2913.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-28 Open Hole/Barefoot Completion 4551.00 4556.00 0
2012-11-02 Multi-Stage Fracture 3708.20 3708.30 0
2012-11-02 Multi-Stage Fracture 3607.90 3608.00 0
2012-11-02 Multi-Stage Fracture 3508.70 3508.80 0
2012-11-03 Multi-Stage Fracture 3406.80 3406.90 0
2012-11-03 Multi-Stage Fracture 3314.40 3314.50 0
2012-11-03 Multi-Stage Fracture 3214.70 3214.80 0
2012-11-03 Multi-Stage Fracture 3113.70 3113.80 0
2012-11-03 Multi-Stage Fracture 3011.00 3011.10 0
2014-12-08 Perforation 4400.00 4401.00 14
2014-12-08 Perforation 4299.00 4300.00 14
2012-10-28 Multi-Stage Fracture 4514.90 4515.00 0
2014-12-08 Perforation 4196.00 4197.00 14
2014-12-08 Perforation 4098.00 4099.00 14
2014-12-08 Perforation 3995.00 3996.00 14
2014-12-08 Perforation 3906.00 3907.00 14
2014-12-08 Perforation 3806.50 3807.50 14
2014-12-08 Perforation 3700.50 3701.50 14
2014-12-08 Perforation 3600.50 3601.50 14
2014-12-08 Perforation 3501.00 3502.00 14
2014-12-09 Perforation 3399.50 3400.50 14
2014-12-09 Perforation 3310.00 3311.00 14
2012-10-29 Multi-Stage Fracture 4407.50 4407.60 0
2014-12-09 Perforation 3207.50 3208.50 14
2014-12-09 Perforation 3106.00 3107.00 14
2014-12-09 Perforation 3017.50 3018.50 14
2012-10-29 Multi-Stage Fracture 4306.30 4306.40 0
2012-10-29 Multi-Stage Fracture 4203.80 4203.90 0
2012-10-29 Multi-Stage Fracture 4105.40 4105.50 0
2012-10-30 Multi-Stage Fracture 4002.70 4002.80 0
2012-10-30 Multi-Stage Fracture 3913.40 3913.50 0
2012-11-02 Multi-Stage Fracture 3810.80 3810.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 216 0.0 0.0 0.0
2013 6387 0.0 0.0 0.0
2014 5561 0.0 0.0 0.0
2015 1889 0.0 0.0 0.0
2016 3283 0.0 0.0 0.0
2017 3431 0.0 0.0 0.0
2018 5180 0.0 0.0 0.0
2019 3301 0.0 0.0 0.0
2020 1339 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-02 No Incident Encountered 0.00 0.00
2012-11-15 No Incident Encountered 0.00 0.00
2014-12-09 No Incident Encountered 0.00 0.00

For data sources see[8]

References