X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666060208000

Well Details

Well ID: 0666060208000
Loading map...
Location: 00/08-02-066-06W6/0
Location Alias: 00/08-02-66-06 W6M
Location Alias 2: 00/08-02-066-06 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 06
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ ET AL WAPITI 8-2-66-6
Operator Name: NuVista Energy Ltd.
License Number: 0487830
License Date: 2018-01-25
License Status: Amended
Spud Date: 2018-03-20
Final Drill Date: 2018-04-18
Well Total Depth: 5780.00 m
Surface Hole Latitude: 54.670410
Surface Hole Longitude: -118.753946

For data sources see[1][2]

Well History

Date Event
2018-01-25 Obtained License
2018-03-21 Surface Casing Operation Performed
2018-03-25 Direction Drilling Operation Performed - Deviate
2018-04-03 Direction Drilling Operation Performed - Horizontal
2018-04-03 Well Log Performed
2018-04-05 Intermediate Casing Operation Performed
2018-04-18 Finished Drilling
2018-04-18 Well Log Performed
2018-04-18 Well Mode changed to Drilled and Cased
2018-04-21 Liner Casing Operation Performed
2018-04-22 Perforation Treatment Performed - Open-Hole Completion
2018-04-22 Rig Released
2018-10-25 Perforation Treatment Performed - Jet Perforation
2018-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-26 Perforation Treatment Performed - Fractured
2018-10-26 Perforation Treatment Performed - Jet Perforation
2018-10-27 Perforation Treatment Performed - Fractured
2018-10-27 Perforation Treatment Performed - Jet Perforation
2018-10-28 Perforation Treatment Performed - Fractured
2018-10-28 Perforation Treatment Performed - Jet Perforation
2018-10-29 Perforation Treatment Performed - Fractured
2018-10-30 Perforation Treatment Performed - Fractured
2018-10-30 Perforation Treatment Performed - Jet Perforation
2018-10-31 Perforation Treatment Performed - Fractured
2018-10-31 Perforation Treatment Performed - Jet Perforation
2018-11-01 Perforation Treatment Performed - Fractured
2018-11-01 Perforation Treatment Performed - Jet Perforation
2018-11-02 Perforation Treatment Performed - Fractured
2018-11-02 Perforation Treatment Performed - Jet Perforation
2018-11-03 Perforation Treatment Performed - Fractured
2018-11-03 Perforation Treatment Performed - Jet Perforation
2018-11-04 Perforation Treatment Performed - Fractured
2018-11-04 Perforation Treatment Performed - Jet Perforation
2018-11-05 Perforation Treatment Performed - Fractured
2018-11-05 Perforation Treatment Performed - Jet Perforation
2018-11-06 Perforation Treatment Performed - Fractured
2018-11-06 Perforation Treatment Performed - Jet Perforation
2018-11-07 Perforation Treatment Performed - Fractured
2018-11-07 Perforation Treatment Performed - Jet Perforation
2018-11-08 Perforation Treatment Performed - Fractured
2018-11-08 Perforation Treatment Performed - Jet Perforation
2018-11-09 Perforation Treatment Performed - Fractured
2018-11-09 Perforation Treatment Performed - Jet Perforation
2018-11-10 Perforation Treatment Performed - Fractured
2018-11-10 Perforation Treatment Performed - Jet Perforation
2018-11-11 Perforation Treatment Performed - Fractured
2018-11-11 Perforation Treatment Performed - Jet Perforation
2018-11-12 Perforation Treatment Performed - Fractured
2018-11-12 Perforation Treatment Performed - Jet Perforation
2018-11-13 Perforation Treatment Performed - Fractured
2019-02-17 Well Began Production
2019-02-17 Well Fluid changed to Gas
2019-02-17 Well Mode changed to Flowing
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Pumping
2020-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-03-20 Nabors Drilling Canada Limited 17 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-03-25 1357.70 Deviate (5 - 79 degrees)
2018-04-03 3185.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-04-22 Open Hole/Barefoot Completion 5775.00 5780.00 0
2018-10-27 Fracture 5513.00 5514.00 0
2018-10-27 Perforation 5459.50 5460.50 12
2018-10-27 Fracture 5459.50 5460.50 0
2018-10-27 Perforation 5404.00 5405.00 12
2018-10-27 Fracture 5404.00 5405.00 0
2018-10-28 Perforation 5357.00 5358.00 12
2018-10-28 Fracture 5357.00 5358.00 0
2018-10-28 Perforation 5303.00 5304.00 12
2018-10-28 Fracture 5303.00 5304.00 0
2018-10-28 Perforation 5241.00 5242.00 12
2018-10-25 Multi-Stage Fracture 5754.80 5755.80 0
2018-10-29 Fracture 5241.00 5242.00 0
2018-10-30 Perforation 5179.50 5180.50 12
2018-10-30 Fracture 5179.50 5180.50 0
2018-10-30 Perforation 5118.00 5119.00 12
2018-10-30 Fracture 5118.00 5119.00 0
2018-10-30 Perforation 5056.50 5057.50 12
2018-10-30 Fracture 5056.50 5057.50 0
2018-10-30 Perforation 4995.00 4996.00 12
2018-10-31 Fracture 4995.00 4996.00 0
2018-10-31 Perforation 4933.50 4934.50 12
2018-10-25 Perforation 5677.50 5678.50 12
2018-10-31 Fracture 4933.50 4934.50 0
2018-11-01 Perforation 4871.50 4872.50 12
2018-11-01 Fracture 4871.50 4872.50 0
2018-11-01 Perforation 4809.50 4810.50 12
2018-11-01 Fracture 4809.50 4810.50 0
2018-11-01 Perforation 4748.00 4749.00 12
2018-11-02 Fracture 4748.00 4749.00 0
2018-11-02 Perforation 4686.00 4687.00 12
2018-11-02 Fracture 4686.00 4687.00 0
2018-11-02 Perforation 4624.50 4625.50 12
2018-10-26 Fracture 5677.50 5678.50 0
2018-11-03 Fracture 4624.50 4625.50 0
2018-11-03 Perforation 4563.00 4564.00 12
2018-11-03 Fracture 4563.00 4564.00 0
2018-11-03 Perforation 4501.00 4502.00 12
2018-11-03 Fracture 4501.00 4502.00 0
2018-11-03 Perforation 4439.50 4440.50 12
2018-11-03 Fracture 4439.50 4440.50 0
2018-11-04 Perforation 4377.50 4378.50 12
2018-11-04 Fracture 4377.50 4378.50 0
2018-11-04 Perforation 4316.00 4317.00 12
2018-10-26 Perforation 5622.00 5623.00 12
2018-11-04 Fracture 4316.00 4317.00 0
2018-11-04 Perforation 4255.00 4256.00 12
2018-11-04 Fracture 4255.00 4256.00 0
2018-11-04 Perforation 4190.00 4191.00 12
2018-11-04 Fracture 4190.00 4191.00 0
2018-11-05 Perforation 4131.00 4132.00 12
2018-11-05 Fracture 4131.00 4132.00 0
2018-11-05 Perforation 4070.00 4071.00 12
2018-11-05 Fracture 4070.00 4071.00 0
2018-11-05 Perforation 4009.00 4010.00 12
2018-10-26 Fracture 5622.00 5623.00 0
2018-11-06 Fracture 4009.00 4010.00 0
2018-11-06 Perforation 3948.00 3949.00 12
2018-11-06 Fracture 3948.00 3949.00 0
2018-11-07 Perforation 3888.50 3889.50 12
2018-11-07 Fracture 3888.50 3889.50 0
2018-11-07 Perforation 3823.50 3824.50 12
2018-11-07 Fracture 3823.50 3824.50 0
2018-11-07 Perforation 3761.50 3762.50 12
2018-11-08 Fracture 3761.50 3762.50 0
2018-11-08 Perforation 3700.00 3701.00 12
2018-10-26 Perforation 5568.00 5569.00 12
2018-11-09 Fracture 3700.00 3701.00 0
2018-11-09 Perforation 3644.00 3645.00 12
2018-11-09 Fracture 3644.00 3645.00 0
2018-11-09 Perforation 3591.00 3592.00 12
2018-11-10 Fracture 3591.00 3592.00 0
2018-11-10 Perforation 3536.00 3537.00 12
2018-11-11 Fracture 3536.00 3537.00 0
2018-11-11 Perforation 3482.00 3483.00 12
2018-11-12 Fracture 3482.00 3483.00 0
2018-11-12 Perforation 3421.00 3422.00 12
2018-10-26 Fracture 5568.00 5569.00 0
2018-11-12 Fracture 3421.00 3422.00 0
2018-11-12 Perforation 3365.00 3366.00 12
2018-11-12 Fracture 3365.00 3366.00 0
2018-11-12 Perforation 3318.00 3319.00 12
2018-11-13 Fracture 3318.00 3319.00 0
2018-10-27 Perforation 5513.00 5514.00 12

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-25 2018-11-13 3,059 34,463 N/A
2 2018-10-25 2018-11-12 3,059 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 91.1494 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 7.6814 N/A
40/70 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 2.0453 N/A
SFR-302 (Friction Reducer) Step Energy Services Friction Reducer Proprietary Trade Secret 100 0.0359 N/A
Sodium Chloride 7647-14-5 100 0.0359 N/A
NanoActiv HRT-78 Nissan Chemical America Corportation Surfactant Amorphous Silica 7631-86-9 100 0.0003 N/A
Ethylene glycol 107-21-1 100 0.0003 N/A
Non-Hazardous Ingredients Not Available 100 0.0003 N/A
Proprietary Trade Secret 100 0.0003 N/A
2 SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0003 N/A
Cured Acrylic Resin Not Available 100 0.0003 N/A
Non-Hazardous Ingredients Not Available 100 0.0003 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.0138 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0138 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-29 2018-11-13 Surface Water - River 34463

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7416 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-22 No Incident Encountered 0.00 0.00
2018-11-20 No Incident Encountered 0.00 0.00
2019-03-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References