If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0666052403002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.735087,"lon":-118.626554,"icon":""}]} |
| Location: 00/03-24-066-05W6/2 | |
| Location Alias: 00/03-24-66-05 W6M | |
| Location Alias 2: 00/03-24-066-05 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 066 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 24 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: PARA HZ KARR 3-24-66-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0418685 | |
| License Date: 2010-02-18 | |
| License Status: Suspension | |
| Spud Date: 2010-03-23 | |
| Final Drill Date: 2010-05-05 | |
| Well Total Depth: 4549.00 m | |
| Surface Hole Latitude: 54.735087 | |
| Surface Hole Longitude: -118.626554 |
| Date | Event |
|---|---|
| 2010-02-18 | Obtained License |
| 2010-03-25 | Surface Casing Operation Performed |
| 2010-04-03 | Well Log Performed |
| 2010-04-04 | Direction Drilling Operation Performed - Horizontal |
| 2010-04-13 | Well Log Performed |
| 2010-04-14 | Intermediate Casing Operation Performed |
| 2010-05-05 | Finished Drilling |
| 2010-05-05 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-05-05 | Well Log Performed |
| 2010-05-05 | Well Mode changed to Drilled and Cased |
| 2010-05-06 | Well Log Performed |
| 2010-05-09 | Liner Casing Operation Performed |
| 2010-05-10 | Rig Released |
| 2010-05-17 | Well Log Performed |
| 2010-05-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-05-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-06-15 | Perforation Treatment Performed - Jet Perforation |
| 2010-06-16 | Perforation Treatment Performed - Fractured |
| 2010-06-18 | Perforation Treatment Performed - Jet Perforation |
| 2010-06-21 | Perforation Treatment Performed - Fractured |
| 2010-06-23 | Perforation Treatment Performed - Jet Perforation |
| 2010-06-25 | Perforation Treatment Performed - Fractured |
| 2010-06-27 | Perforation Treatment Performed - Jet Perforation |
| 2010-07-03 | Perforation Treatment Performed - Fractured |
| 2011-11-08 | Well Began Production |
| 2011-11-08 | Well Fluid changed to Gas |
| 2011-11-08 | Well Mode changed to Flowing |
| 2016-09-20 | Well Fluid changed to Gas |
| 2016-09-20 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-04-04 | 2573.90 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-05-05 | Open Hole/Barefoot Completion | 4545.00 | 4549.00 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3957.80 | 3958.60 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3887.00 | 3887.80 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3830.70 | 3831.50 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3772.10 | 3772.90 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3700.50 | 3701.30 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3643.00 | 3643.80 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3572.90 | 3573.70 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3513.80 | 3514.60 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3456.40 | 3457.20 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3385.70 | 3386.50 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 4522.70 | 4524.10 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3327.00 | 3327.80 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3269.60 | 3270.40 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3199.20 | 3200.00 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3140.80 | 3141.60 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 3083.00 | 3083.80 | 0 |
| 2010-05-30 | Multi-Stage Fracture | 3012.00 | 3012.80 | 0 |
| 2010-05-30 | Multi-Stage Fracture | 2954.30 | 2955.10 | 0 |
| 2010-06-15 | Perforation | 2419.00 | 2420.50 | 17 |
| 2010-06-15 | Perforation | 2414.50 | 2416.00 | 17 |
| 2010-06-16 | Fracture | 2419.00 | 2420.50 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 4457.10 | 4457.90 | 0 |
| 2010-06-16 | Fracture | 2414.50 | 2416.00 | 0 |
| 2010-06-18 | Perforation | 2256.00 | 2258.00 | 17 |
| 2010-06-21 | Fracture | 2256.00 | 2258.00 | 0 |
| 2010-06-23 | Perforation | 2122.00 | 2124.00 | 17 |
| 2010-06-25 | Fracture | 2122.00 | 2124.00 | 0 |
| 2010-06-27 | Perforation | 1717.00 | 1719.00 | 17 |
| 2010-06-27 | Perforation | 1680.00 | 1682.00 | 17 |
| 2010-07-03 | Fracture | 1717.00 | 1719.00 | 0 |
| 2010-07-03 | Fracture | 1680.00 | 1682.00 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 4399.00 | 4399.80 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 4329.20 | 4330.00 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 4269.20 | 4270.70 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 4209.90 | 4210.70 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 4136.60 | 4138.10 | 0 |
| 2010-05-29 | Multi-Stage Fracture | 4075.90 | 4076.70 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 1046 | 0.0 | 0.0 | 0.0 |
| 2012 | 7178 | 0.0 | 0.0 | 0.0 |
| 2013 | 7287 | 0.0 | 0.0 | 0.0 |
| 2014 | 2832 | 0.0 | 0.0 | 0.0 |
| 2015 | 516 | 0.0 | 0.0 | 0.0 |
| 2016 | 551 | 0.0 | 0.0 | 0.0 |
For data sources see[6]