If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0666051303003 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/03-13-066-05W6/3 | |
| Location Alias: 00/03-13-66-05 W6M | |
| Location Alias 2: 00/03-13-066-05 W6/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 066 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 13 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: PARA REN HZ KARR 3-13-66-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0364751 | |
| License Date: 2006-10-19 | |
| License Status: Suspension | |
| Spud Date: 2008-10-23 | |
| Final Drill Date: 2008-11-05 | |
| Well Total Depth: 3495.00 m | |
| Surface Hole Latitude: 54.713812 | |
| Surface Hole Longitude: -118.620506 |
| Date | Event |
|---|---|
| 2006-10-19 | Obtained License |
| 2008-10-26 | Direction Drilling Operation Performed - Horizontal |
| 2008-11-05 | Finished Drilling |
| 2008-11-05 | Perforation Treatment Performed - Open-Hole Completion |
| 2008-11-05 | Well Log Performed |
| 2008-11-05 | Well Mode changed to Drilled and Cased |
| 2008-11-06 | Well Log Performed |
| 2008-11-08 | Liner Casing Operation Performed |
| 2008-11-09 | Rig Released |
| 2008-11-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2008-11-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2009-02-02 | Well Began Production |
| 2009-02-02 | Well Fluid changed to Gas |
| 2009-02-02 | Well Mode changed to Flowing |
| 2011-02-01 | Well Fluid changed to Gas |
| 2011-02-01 | Well Mode changed to Pumping |
| 2014-11-19 | Well Fluid changed to Gas |
| 2014-11-19 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2008-10-26 | 2658.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2008-11-05 | Open Hole/Barefoot Completion | 3426.00 | 3495.00 | 0 |
| 2008-11-20 | Multi-Stage Fracture | 3368.40 | 3369.70 | 0 |
| 2008-11-20 | Multi-Stage Fracture | 3267.90 | 3268.70 | 0 |
| 2008-11-20 | Multi-Stage Fracture | 3179.60 | 3180.40 | 0 |
| 2008-11-20 | Multi-Stage Fracture | 3091.60 | 3092.40 | 0 |
| 2008-11-20 | Multi-Stage Fracture | 2978.70 | 2979.50 | 0 |
| 2008-11-21 | Multi-Stage Fracture | 2915.60 | 2916.40 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 4855 | 0.0 | 0.0 | 0.0 |
| 2011 | 7264 | 0.0 | 0.0 | 0.0 |
| 2012 | 7270 | 0.0 | 0.0 | 0.0 |
| 2013 | 7409 | 0.0 | 0.0 | 0.0 |
| 2014 | 3817 | 0.0 | 0.0 | 0.0 |
For data sources see[6]