If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0666050401002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.687672,"lon":-118.680558,"icon":""}]} |
| Location: 00/01-04-066-05W6/2 | |
| Location Alias: 00/01-04-66-05 W6M | |
| Location Alias 2: 00/01-04-066-05 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 066 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 04 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: PARA ET AL HZ KARR 1-4-66-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0416411 | |
| License Date: 2009-12-24 | |
| License Status: Amended | |
| Spud Date: 2010-10-01 | |
| Final Drill Date: 2010-10-28 | |
| Well Total Depth: 4250.00 m | |
| Surface Hole Latitude: 54.687672 | |
| Surface Hole Longitude: -118.680558 |
| Date | Event |
|---|---|
| 2009-12-24 | Obtained License |
| 2010-10-06 | Direction Drilling Operation Performed - Horizontal |
| 2010-10-13 | Well Log Performed |
| 2010-10-28 | Finished Drilling |
| 2010-10-28 | Well Log Performed |
| 2010-10-28 | Well Mode changed to Drilled and Cased |
| 2010-10-30 | Liner Casing Operation Performed |
| 2010-10-30 | Well Log Performed |
| 2010-11-01 | Rig Released |
| 2011-02-05 | Well Log Performed |
| 2011-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-03-20 | Well Log Performed |
| 2011-03-22 | Well Log Performed |
| 2011-03-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-03-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-03-31 | Well Log Performed |
| 2011-04-19 | Well Log Performed |
| 2011-06-18 | Well Began Production |
| 2011-06-18 | Well Fluid changed to Gas |
| 2011-06-18 | Well Mode changed to Flowing |
| 2014-01-31 | Well Fluid changed to Gas |
| 2014-01-31 | Well Mode changed to Suspended |
| 2014-11-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-11-05 | Plug Back Performed |
| 2014-11-05 | Well Fluid changed to Gas |
| 2014-11-05 | Well Mode changed to Abandoned Zone |
| 2014-11-12 | Perforation Treatment Performed - Cement Plug |
| 2014-11-12 | Plug Back Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-10-06 | 2781.80 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-03-12 | Multi-Stage Fracture | 4219.60 | 4220.90 | 0 |
| 2011-03-14 | Multi-Stage Fracture | 3668.90 | 3669.70 | 0 |
| 2011-03-14 | Multi-Stage Fracture | 3606.50 | 3607.30 | 0 |
| 2011-03-28 | Multi-Stage Fracture | 3544.30 | 3545.10 | 0 |
| 2011-03-28 | Multi-Stage Fracture | 3482.00 | 3482.80 | 0 |
| 2011-03-28 | Multi-Stage Fracture | 3419.70 | 3420.50 | 0 |
| 2011-03-28 | Multi-Stage Fracture | 3371.20 | 3372.00 | 0 |
| 2011-03-28 | Multi-Stage Fracture | 3308.80 | 3309.60 | 0 |
| 2011-03-28 | Multi-Stage Fracture | 3246.60 | 3247.40 | 0 |
| 2011-03-28 | Multi-Stage Fracture | 3184.30 | 3185.10 | 0 |
| 2011-03-28 | Multi-Stage Fracture | 3121.90 | 3122.70 | 0 |
| 2011-03-12 | Multi-Stage Fracture | 4138.40 | 4139.20 | 0 |
| 2011-03-28 | Multi-Stage Fracture | 3073.40 | 3074.20 | 0 |
| 2011-03-28 | Multi-Stage Fracture | 3011.10 | 3011.90 | 0 |
| 2011-03-29 | Multi-Stage Fracture | 2948.70 | 2949.50 | 0 |
| 2014-11-05 | Packing Device Capped w/Cement | 2902.00 | 2910.00 | 0 |
| 2014-11-12 | Cement Plug | 2754.00 | 2850.00 | 0 |
| 2011-03-12 | Multi-Stage Fracture | 4076.00 | 4076.80 | 0 |
| 2011-03-12 | Multi-Stage Fracture | 4027.40 | 4028.20 | 0 |
| 2011-03-12 | Multi-Stage Fracture | 3965.00 | 3965.80 | 0 |
| 2011-03-12 | Multi-Stage Fracture | 3903.50 | 3904.30 | 0 |
| 2011-03-12 | Multi-Stage Fracture | 3841.10 | 3841.90 | 0 |
| 2011-03-13 | Multi-Stage Fracture | 3778.80 | 3779.60 | 0 |
| 2011-03-13 | Multi-Stage Fracture | 3730.40 | 3731.20 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 1577 | 0.0 | 0.0 | 0.0 |
| 2012 | 2856 | 0.0 | 0.0 | 0.0 |
| 2013 | 1415 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-07-03 | No Incident Encountered | 0.00 | 0.00 |
| 2014-11-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]