X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666043304002

Well Details

Well ID: 0666043304002
Loading map...
Location: 00/04-33-066-04W6/2
Location Alias: 00/04-33-66-04 W6M
Location Alias 2: 00/04-33-066-04 W6/02
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 04
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ GOLDCK 4-33-66-4
Operator Name: Paramount Resources Ltd.
License Number: 0466640
License Date: 2014-05-14
License Status: Amended
Spud Date: 2014-06-17
Final Drill Date: 2014-07-13
Well Total Depth: 4224.00 m
Surface Hole Latitude: 54.736142
Surface Hole Longitude: -118.551609

For data sources see[1][2]

Well History

Date Event
2014-05-14 Obtained License
2014-06-20 Surface Casing Operation Performed
2014-06-28 Direction Drilling Operation Performed - Deviate
2014-07-03 Direction Drilling Operation Performed - Horizontal
2014-07-03 Well Log Performed
2014-07-04 Well Log Performed
2014-07-05 Intermediate Casing Operation Performed
2014-07-06 Well Log Performed
2014-07-13 Finished Drilling
2014-07-13 Well Log Performed
2014-07-13 Well Mode changed to Drilled and Cased
2014-07-14 Well Log Performed
2014-07-15 Liner Casing Operation Performed
2014-07-15 Perforation Treatment Performed - Open-Hole Completion
2014-07-15 Well Log Performed
2014-07-20 Rig Released
2014-08-07 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2014-09-01 Well Log Performed
2014-09-02 Perforation Treatment Performed - Jet Perforation
2014-09-02 Well Log Performed
2014-09-03 Well Log Performed
2014-09-04 Perforation Treatment Performed - Fractured
2014-09-07 Perforation Treatment Performed - Jet Perforation
2014-09-11 Perforation Treatment Performed - Fractured
2014-09-16 Perforation Treatment Performed - Cement Squeeze
2014-09-16 Plug Back Performed
2014-11-12 Well Began Production
2014-11-12 Well Fluid changed to Gas
2014-11-12 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Gas
2017-04-01 Well Mode changed to Pumping
2017-04-02 Perforation Treatment Performed - Jet Perforation
2017-04-03 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-06-28 2248.50 Deviate (5 - 79 degrees)
2014-07-03 2758.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-07-15 Open Hole/Barefoot Completion 4213.90 4224.00 0
2014-08-08 Multi-Stage Fracture 3643.60 3645.20 0
2014-08-08 Multi-Stage Fracture 3558.70 3560.30 0
2014-08-08 Multi-Stage Fracture 3499.20 3500.90 0
2014-08-08 Multi-Stage Fracture 3427.20 3428.90 0
2014-08-08 Multi-Stage Fracture 3355.70 3357.40 0
2014-08-08 Multi-Stage Fracture 3284.30 3285.90 0
2014-08-08 Multi-Stage Fracture 3212.10 3213.80 0
2014-08-08 Multi-Stage Fracture 3140.00 3141.70 0
2014-08-08 Multi-Stage Fracture 3067.70 3069.40 0
2014-08-08 Multi-Stage Fracture 2983.60 2985.30 0
2014-08-07 Multi-Stage Fracture 4202.00 4203.30 0
2014-08-08 Multi-Stage Fracture 2898.70 2900.30 0
2014-08-08 Multi-Stage Fracture 2851.80 2853.40 0
2014-09-02 Perforation 2286.00 2289.00 17
2014-09-02 Perforation 2284.00 2286.00 17
2014-09-02 Perforation 2282.00 2284.00 17
2014-09-04 Fracture 2282.00 2289.00 0
2014-09-07 Perforation 1624.50 1629.00 17
2014-09-07 Perforation 1621.00 1624.50 17
2014-09-11 Fracture 1621.00 1629.00 0
2014-09-16 Cement Squeeze 1621.00 1629.00 0
2014-08-07 Multi-Stage Fracture 4136.60 4138.20 0
2017-04-02 Perforation 3994.90 3995.40 20
2017-04-02 Perforation 3922.90 3923.40 20
2017-04-02 Perforation 3851.00 3851.50 20
2017-04-02 Perforation 3777.90 3778.40 20
2017-04-02 Perforation 3706.00 3706.50 20
2017-04-02 Perforation 3633.80 3634.30 20
2017-04-03 Perforation 3548.80 3549.30 20
2017-04-03 Perforation 3489.40 3489.90 20
2017-04-03 Perforation 3417.40 3417.90 20
2017-04-03 Perforation 3345.90 3346.40 20
2014-08-07 Multi-Stage Fracture 4077.00 4078.60 0
2017-04-03 Perforation 3274.60 3275.10 20
2017-04-03 Perforation 3202.30 3202.80 20
2017-04-03 Perforation 3130.20 3130.70 20
2017-04-03 Perforation 3057.90 3058.40 20
2017-04-03 Perforation 2973.80 2974.30 20
2017-04-03 Perforation 2888.80 2889.30 20
2017-04-03 Perforation 2841.90 2842.40 20
2014-08-07 Multi-Stage Fracture 4004.70 4006.40 0
2014-08-07 Multi-Stage Fracture 3932.70 3934.40 0
2014-08-07 Multi-Stage Fracture 3860.90 3862.50 0
2014-08-08 Multi-Stage Fracture 3787.70 3789.40 0
2014-08-08 Multi-Stage Fracture 3715.80 3717.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 795 0.0 0.0 0.0
2015 3342 0.0 0.0 0.0
2016 2377 0.0 0.0 0.0
2017 442 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-20 No Incident Encountered 0.00 0.00
2014-09-01 No Incident Encountered 0.00 0.00
2014-09-23 No Incident Encountered 0.00 0.00
2014-12-04 No Incident Encountered 0.00 0.00
2017-04-03 No Incident Encountered 0.00 0.00

For data sources see[7]

References