X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666041914000

Well Details

Well ID: 0666041914000
Loading map...
Location: 00/14-19-066-04W6/0
Location Alias: 00/14-19-66-04 W6M
Location Alias 2: 00/14-19-066-04 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 04
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA GOLDCK 14-19-66-4
Operator Name: Paramount Resources Ltd.
License Number: 0270945
License Date: 2002-06-17
License Status: Amended
Spud Date: 2003-02-24
Final Drill Date: 2003-06-01
Well Total Depth: 4134.50 m
Surface Hole Latitude: 54.733108
Surface Hole Longitude: -118.593881

For data sources see[1][2]

Well History

Date Event
2002-03-30 Well Log Performed
2002-06-17 Obtained License
2003-02-27 Surface Casing Operation Performed
2003-03-30 Well Log Performed
2003-04-01 Intermediate Casing Operation Performed
2003-04-16 Kick Occurred
2003-04-16 Lost Circulation Occurred
2003-05-14 Well Log Performed
2003-05-15 Well Log Performed
2003-05-16 Well Log Performed
2003-05-25 Liner Casing Operation Performed
2003-05-26 Liner Casing Operation Performed
2003-05-30 Well Log Performed
2003-06-01 Finished Drilling
2003-06-01 Well Mode changed to Drilled and Cased
2003-06-02 Well Log Performed
2003-06-05 Well Log Performed
2003-06-15 Rig Released
2003-06-15 Well Log Performed
2003-06-24 Perforation Treatment Performed - Jet Perforation
2003-06-25 Well Began Production
2003-06-25 Well Fluid changed to Crude Oil
2003-06-25 Well Mode changed to Flowing
2011-11-25 Well Fluid changed to Crude Oil
2011-11-25 Well Mode changed to Gas Lift
2014-05-01 Well Fluid changed to Crude Oil
2014-05-01 Well Mode changed to Suspended
2016-11-29 Well Log Performed
2017-03-31 Perforation Treatment Performed - Jet Perforation
2017-03-31 Well Log Performed
2017-04-01 Well Log Performed
2017-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-04-11 Well Log Performed
2017-04-18 Well Log Performed
2017-06-01 Well Began Injection
2017-06-01 Well Fluid changed to Water
2017-06-01 Well Type changed to Disposal
2018-09-13 Well Log Performed
2019-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-11 Plug Back Performed
2020-01-11 Well Fluid changed to Water
2020-01-11 Well Mode changed to Abandoned Zone
2020-01-11 Well Type changed to Disposal
2020-01-13 Perforation Treatment Performed - Jet Perforation
2020-01-14 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-06-24 Perforation 4078.50 4081.50 13
2020-01-13 Perforation 3735.00 3738.00 17
2020-01-13 Perforation 3729.00 3735.00 17
2020-01-13 Perforation 3723.00 3729.00 17
2020-01-13 Perforation 3717.00 3723.00 17
2020-01-13 Perforation 3711.00 3717.00 17
2020-01-13 Perforation 3777.00 3783.00 17
2020-01-13 Perforation 3772.00 3777.00 17
2020-01-14 Perforation 3705.00 3711.00 17
2020-01-14 Perforation 3699.00 3705.00 17
2020-01-14 Perforation 3693.00 3699.00 17
2003-06-24 Perforation 4065.00 4075.50 13
2020-01-14 Perforation 3687.00 3693.00 17
2020-01-14 Perforation 3681.00 3687.00 17
2020-01-14 Perforation 3675.00 3681.00 17
2020-01-14 Perforation 3669.00 3675.00 17
2020-01-14 Perforation 3663.00 3669.00 17
2020-01-14 Perforation 3657.00 3663.00 17
2017-03-31 Perforation 4068.60 4081.60 20
2017-04-08 Acid Treatment 4068.60 4081.60 0
2019-05-03 Acid Treatment 4068.60 4081.60 0
2020-01-07 Acid Treatment 4065.00 4081.60 0
2020-01-11 Packing Device Capped w/Cement 4042.00 4050.50 0
2020-01-13 Perforation 3761.00 3767.00 17
2020-01-13 Perforation 3756.00 3761.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 161 0.0 0.0 0.0
2004 5557 0.0 0.0 0.0
2005 8758 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 7833 0.0 0.0 0.0
2008 8028 0.0 0.0 0.0
2009 7175 0.0 0.0 0.0
2010 8332 0.0 0.0 0.0
2011 7095 0.0 0.0 0.0
2012 6224 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2003-04-16 Kick 4066.00 4066.00
2003-04-16 Lost Circulation 4066.00 4066.00
2017-04-08 No Incident Encountered 0.00 0.00
2018-09-19 No Incident Encountered 0.00 0.00
2019-05-03 No Incident Encountered 0.00 0.00
2020-01-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References