X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665251207020

Well Details

Well ID: 0665251207020
Loading map...
Location: 02/07-12-066-25W5/0
Location Alias: 02/07-12-66-25 W5M
Location Alias 2: 02/07-12-066-25 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 25
Section: 12
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC HZ 102 ANTEN 7-12-66-25
Operator Name: ARC Resources Ltd.
License Number: 0489325
License Date: 2018-05-30
License Status: Issued
Spud Date: 2018-11-13
Final Drill Date: 2018-12-12
Well Total Depth: 4216.00 m
Surface Hole Latitude: 54.675434
Surface Hole Longitude: -117.641871

For data sources see[1][2]

Well History

Date Event
2018-05-30 Obtained License
2018-11-14 Surface Casing Operation Performed
2018-11-28 Direction Drilling Operation Performed - Deviate
2018-11-30 Direction Drilling Operation Performed - Horizontal
2018-12-04 Well Log Performed
2018-12-12 Finished Drilling
2018-12-12 Production Casing Operation Performed
2018-12-12 Rig Released
2018-12-12 Well Mode changed to Drilled and Cased
2019-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-04-20 Well Began Production
2019-04-20 Well Fluid changed to Crude Oil
2019-04-20 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-13 Precision Drilling Corporation 529 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-11-28 1676.90 Deviate (5 - 79 degrees)
2018-11-30 2180.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-02-04 Multi-Stage Fracture 4048.10 4048.20 0
2019-02-04 Multi-Stage Fracture 3701.80 3701.90 0
2019-02-04 Multi-Stage Fracture 3663.50 3663.60 0
2019-02-04 Multi-Stage Fracture 3624.80 3624.90 0
2019-02-04 Multi-Stage Fracture 3586.50 3586.60 0
2019-02-04 Multi-Stage Fracture 3547.90 3548.00 0
2019-02-04 Multi-Stage Fracture 3509.30 3509.40 0
2019-02-04 Multi-Stage Fracture 3470.70 3470.80 0
2019-02-04 Multi-Stage Fracture 3432.50 3432.60 0
2019-02-04 Multi-Stage Fracture 3393.90 3394.00 0
2019-02-04 Multi-Stage Fracture 3355.30 3355.40 0
2019-02-04 Multi-Stage Fracture 4009.50 4009.60 0
2019-02-04 Multi-Stage Fracture 3316.80 3316.90 0
2019-02-04 Multi-Stage Fracture 3278.20 3278.30 0
2019-02-04 Multi-Stage Fracture 3239.60 3239.70 0
2019-02-04 Multi-Stage Fracture 3201.00 3201.10 0
2019-02-04 Multi-Stage Fracture 3162.40 3162.50 0
2019-02-04 Multi-Stage Fracture 3124.20 3124.30 0
2019-02-04 Multi-Stage Fracture 3085.60 3085.70 0
2019-02-04 Multi-Stage Fracture 3047.00 3047.10 0
2019-02-04 Multi-Stage Fracture 3008.40 3008.50 0
2019-02-04 Multi-Stage Fracture 2969.80 2969.90 0
2019-02-04 Multi-Stage Fracture 3971.00 3971.10 0
2019-02-04 Multi-Stage Fracture 2931.70 2931.80 0
2019-02-04 Multi-Stage Fracture 2893.10 2893.20 0
2019-02-04 Multi-Stage Fracture 2854.70 2854.80 0
2019-02-04 Multi-Stage Fracture 2816.10 2816.20 0
2019-02-04 Multi-Stage Fracture 2777.50 2777.60 0
2019-02-04 Multi-Stage Fracture 2738.90 2739.00 0
2019-02-04 Multi-Stage Fracture 2700.30 2700.40 0
2019-02-04 Multi-Stage Fracture 2661.70 2661.80 0
2019-02-04 Multi-Stage Fracture 2623.10 2623.20 0
2019-02-04 Multi-Stage Fracture 2584.90 2585.00 0
2019-02-04 Multi-Stage Fracture 3932.40 3932.50 0
2019-02-06 Multi-Stage Fracture 2546.30 2546.40 0
2019-02-06 Multi-Stage Fracture 2507.70 2507.80 0
2019-02-06 Multi-Stage Fracture 2469.10 2469.20 0
2019-02-06 Multi-Stage Fracture 2430.50 2430.60 0
2019-02-06 Multi-Stage Fracture 2391.90 2392.00 0
2019-02-06 Multi-Stage Fracture 2353.30 2353.40 0
2019-02-06 Multi-Stage Fracture 2314.70 2314.80 0
2019-02-06 Multi-Stage Fracture 2276.10 2276.20 0
2019-02-06 Multi-Stage Fracture 2200.20 2200.30 0
2019-02-04 Multi-Stage Fracture 3893.80 3893.90 0
2019-02-04 Multi-Stage Fracture 3855.20 3855.30 0
2019-02-04 Multi-Stage Fracture 3816.60 3816.70 0
2019-02-04 Multi-Stage Fracture 3778.20 3778.30 0
2019-02-04 Multi-Stage Fracture 3740.40 3740.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-04 2019-02-06 2,053 8,118 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.499 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 12.2632 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.5197 N/A
15% HCl Acid Calfrac Acid Hydrochloric acid 7647-01-0 100 0.5224 N/A
Water 7732-18-5 100 0.5224 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0116 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0116 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0116 N/A
Polyethylene glycol 25322-68-3 100 0.0116 N/A
Sodium bromide 7647-15-6 100 0.0116 N/A
DynaRate 6000. Anionic Friction Reducer Calfrac Friction Reducer Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0866 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0866 N/A
Proprietary polymer Trade Secret 100 0.0866 N/A
Proprietary surfactant blend Trade Secret 100 0.0866 N/A
DHP-991. Coilube Calfrac Solvent Non-Hazardous Ingredients Trade Secret 100 0.0245 N/A
Sorbitan trioleate 26266-58-0 100 0.0245 N/A
CalSurf 9400. Flowback Surfactant Calfrac Surfactant Ethoxylated Alcohols Trade Secret 100 0.0737 N/A
Methanol 67-56-1 100 0.0737 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0737 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-04 2019-02-06 Surface Water - Runoff 8118

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5730 0.0 0.0 0.0
2020 2124 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-12 No Incident Encountered 0.00 0.00
2019-02-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References