X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665132707020

Well Details

Well ID: 0665132707020
Loading map...
Location: 02/07-27-066-13W5/0
Location Alias: 02/07-27-66-13 W5M
Location Alias 2: 02/07-27-066-13 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 13
Section: 27
County/Municipality: Big Lakes County
Well Name: CPEC HZ 102 VIRG 7-27-66-13
Operator Name: Crescent Point Energy Corp.
License Number: 0439318
License Date: 2011-11-22
License Status: Issued
Spud Date: 2012-03-06
Final Drill Date: 2012-03-30
Well Total Depth: 4528.00 m
Surface Hole Latitude: 54.726267
Surface Hole Longitude: -115.872280

For data sources see[1][2]

Well History

Date Event
2011-11-22 Obtained License
2012-03-08 Surface Casing Operation Performed
2012-03-16 Direction Drilling Operation Performed - Deviate
2012-03-18 Direction Drilling Operation Performed - Horizontal
2012-03-20 Intermediate Casing Operation Performed
2012-03-30 Finished Drilling
2012-03-30 Well Log Performed
2012-03-30 Well Mode changed to Drilled and Cased
2012-04-01 Liner Casing Operation Performed
2012-04-02 Rig Released
2012-04-02 Well Log Performed
2012-07-01 Well Began Production
2012-07-01 Well Fluid changed to Crude Oil
2012-07-01 Well Mode changed to Pumping
2012-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-02 Perforation Treatment Performed - Open-Hole Completion
2014-08-16 Well Log Performed
2014-10-01 Well Began Injection
2014-10-01 Well Fluid changed to Water
2014-10-01 Well Type changed to Injection

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-06 Chinook Drilling Inc. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-16 26.00 Deviate (5 - 79 degrees)
2012-03-18 3020.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-02 Open Hole/Barefoot Completion 4519.00 4528.00 0
2012-08-02 Multi-Stage Fracture 3580.40 3850.50 0
2012-08-02 Multi-Stage Fracture 3493.20 3793.30 0
2012-08-02 Multi-Stage Fracture 3419.80 3419.90 0
2012-08-02 Multi-Stage Fracture 3346.50 3346.60 0
2012-08-02 Multi-Stage Fracture 3273.20 3273.30 0
2012-08-02 Multi-Stage Fracture 3185.90 3186.00 0
2012-08-02 Multi-Stage Fracture 3114.00 3114.10 0
2012-08-02 Multi-Stage Fracture 4496.30 4496.40 0
2012-08-02 Multi-Stage Fracture 4400.50 4400.60 0
2012-08-02 Multi-Stage Fracture 4312.70 4312.80 0
2012-08-02 Multi-Stage Fracture 4097.80 4097.90 0
2012-08-02 Multi-Stage Fracture 3984.40 3984.50 0
2012-08-02 Multi-Stage Fracture 3858.20 3858.30 0
2012-08-02 Multi-Stage Fracture 3756.00 3756.10 0
2012-08-02 Multi-Stage Fracture 3654.00 3654.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2409 0.0 0.0 0.0
2013 7385 0.0 0.0 0.0
2014 4871 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-02 No Incident Encountered 0.00 0.00
2012-08-02 No Incident Encountered 0.00 0.00
2012-04-01 No Incident Encountered 0.00 0.00

For data sources see[8]

References