X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665100712000

Well Details

Well ID: 0665100712000
Loading map...
Location: 00/12-07-066-10W5/0
Location Alias: 00/12-07-66-10 W5M
Location Alias 2: 00/12-07-066-10 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 10
Section: 07
County/Municipality: Big Lakes County
Well Name: 1976082 SWANHS 12-7-66-10
Operator Name: Razor Energy Corp.
License Number: 0018497
License Date: 1960-01-14
License Status: Amended
Spud Date: 1960-02-23
Final Drill Date: 1960-03-27
Well Total Depth: 2679.80 m
Surface Hole Latitude: 54.699072
Surface Hole Longitude: -115.510160

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-01-14 Obtained License
1960-03-27 Finished Drilling
1960-03-27 Well Mode changed to Drilled and Cased
1960-03-28 Production Casing Operation Performed
1960-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-04-28 Perforation Treatment Performed - Jet Perforation
1960-05-04 Perforation Treatment Performed - Cement Squeeze
1960-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-05-05 Perforation Treatment Performed - Jet Perforation
1960-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-05-10 Perforation Treatment Performed - Jet Perforation
1960-05-15 Well Began Production
1960-05-15 Well Fluid changed to Crude Oil
1960-05-15 Well Mode changed to Flowing
1971-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-12 Well Fluid changed to Crude Oil
1973-06-12 Well Mode changed to Pumping
1979-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-03 Well Log Performed
1992-02-01 Well Fluid changed to Crude Oil
1992-02-01 Well Mode changed to Suspended
1995-04-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-04 Plug Back Performed
1995-04-04 Well Fluid changed to Crude Oil
1995-04-04 Well Mode changed to Abandoned and Whipstocked
1995-04-08 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-04-28 Perforation 2662.10 2665.80 7
1979-01-18 Acid Treatment 2615.80 2639.60 0
1979-05-22 Acid Treatment 2615.80 2639.60 0
1995-04-04 Packing Device Capped w/Cement 2593.00 2601.00 0
1960-04-28 Acid Treatment 2662.10 2665.80 0
1960-05-04 Cement Squeeze 2662.10 2665.80 0
1960-05-05 Perforation 2636.20 2639.60 7
1960-05-05 Acid Treatment 2636.20 2639.60 0
1960-05-10 Perforation 2615.80 2620.70 7
1960-05-10 Perforation 2627.40 2632.30 7
1960-05-10 Acid Treatment 2615.80 2632.30 0
1971-09-07 Acid Treatment 2615.80 2639.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1971 341 0.0 0.0 0.0
1972 7290 0.0 0.0 0.0
1973 2765 0.0 0.0 0.0
1974 3319 0.0 0.0 0.0
1975 8655 0.0 0.0 0.0
1976 8689 0.0 0.0 0.0
1977 8658 0.0 0.0 0.0
1978 8418 0.0 0.0 0.0
1979 5087 0.0 0.0 0.0
1980 8035 0.0 0.0 0.0
1981 8003 0.0 0.0 0.0
1982 7624 0.0 0.0 0.0
1983 8105 0.0 0.0 0.0
1984 8767 0.0 0.0 0.0
1985 7865 0.0 0.0 0.0
1986 8601 0.0 0.0 0.0
1987 8700 0.0 0.0 0.0
1988 8567 0.0 0.0 0.0
1989 8245 0.0 0.0 0.0
1990 7954 0.0 0.0 0.0
1991 6154 0.0 0.0 0.0
1992 127 0.0 0.0 0.0

For data sources see[5]

References