If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0665050110000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.685396,"lon":-114.61623,"icon":""}]} |
Location: 00/10-01-066-05W5/0 | |
Location Alias: 00/10-01-66-05 W5M | |
Location Alias 2: 00/10-01-066-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 5 | |
Range: 05 | |
Section: 01 | |
County/Municipality: Woodlands County | |
Well Name: ACL FOLEY 10-1-66-5 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0194100 | |
License Date: 1996-11-26 | |
License Status: Abandoned | |
Spud Date: 1997-02-06 | |
Final Drill Date: 1997-02-11 | |
Well Total Depth: 1091.50 m | |
Surface Hole Latitude: 54.685396 | |
Surface Hole Longitude: -114.616230 |
Date | Event |
---|---|
1996-11-26 | Obtained License |
1997-02-07 | Surface Casing Operation Performed |
1997-02-11 | Drill Stem Test Performed |
1997-02-11 | Finished Drilling |
1997-02-11 | Well Log Performed |
1997-02-12 | Production Casing Operation Performed |
1997-02-13 | Rig Released |
1997-02-13 | Well Mode changed to Drilled and Cased |
1997-02-19 | Perforation Treatment Performed - Jet Perforation |
1997-02-20 | Perforation Treatment Performed - Jet Perforation |
1997-02-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2014-03-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-03-05 | Plug Back Performed |
2014-03-05 | Well Log Performed |
2014-03-05 | Well Mode changed to Abandoned Zone |
2014-03-06 | Well Log Performed |
2014-03-14 | Well Abandoned |
2014-03-14 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-02-19 | Perforation | 1078.00 | 1079.00 | 20 |
1997-02-19 | Perforation | 1075.00 | 1077.00 | 20 |
1997-02-20 | Perforation | 1078.00 | 1079.00 | 20 |
1997-02-20 | Perforation | 1075.00 | 1077.00 | 20 |
1997-02-22 | Acid Treatment | 1075.00 | 1079.00 | 0 |
2014-03-05 | Packing Device Capped w/Cement | 1063.80 | 1071.80 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-03-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]