X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665010604000

Well Details

Well ID: 0665010604000
Loading map...
Location: 00/04-06-066-01W5/0
Location Alias: 00/04-06-66-01 W5M
Location Alias 2: 00/04-06-066-01 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 01
Section: 06
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: SEQUOIA BIGB 4-6-66-1
Operator Name: Sequoia Resources Corp.
License Number: 0182325
License Date: 1995-11-21
License Status: Suspension
Spud Date: 1995-11-28
Final Drill Date: 1995-12-01
Well Total Depth: 847.00 m
Surface Hole Latitude: 54.678822
Surface Hole Longitude: -114.147283

For data sources see[1][2]

Well History

Date Event
1995-11-21 Obtained License
1995-11-29 Surface Casing Operation Performed
1995-12-01 Finished Drilling
1995-12-01 Well Log Performed
1995-12-01 Well Mode changed to Drilled and Cased
1995-12-02 Production Casing Operation Performed
1995-12-02 Rig Released
1995-12-17 Perforation Treatment Performed - Jet Perforation
1996-04-09 Well Began Production
1996-04-09 Well Fluid changed to Gas
1996-04-09 Well Mode changed to Flowing
1996-05-28 Perforation Treatment Performed - Jet Perforation
1996-05-28 Well Fluid changed to Gas
1996-05-28 Well Mode changed to Flowing
1996-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-29 Plug Back Performed
1996-05-29 Well Fluid changed to Gas
1996-05-29 Well Mode changed to Abandoned Zone
1997-07-02 Perforation Treatment Performed - Jet Perforation
2005-09-11 Perforation Treatment Performed - Jet Perforation
2005-09-11 Well Log Performed
2005-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-13 Perforation Treatment Performed - Jet Perforation
2005-09-13 Plug Back Performed
2005-09-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-12-17 Perforation 800.00 800.50 13
1996-05-28 Perforation 787.00 788.00 13
1996-05-29 Packing Device Capped w/Cement 790.00 798.00 0
1997-07-02 Perforation 788.00 789.00 13
2005-09-11 Perforation 787.00 789.00 17
2005-09-13 Packing Device Capped w/Cement 773.00 781.00 0
2005-09-13 Perforation 591.00 595.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1077 0.0 0.0 0.0
1997 720 0.0 0.0 0.0

For data sources see[5]

References